Similar Projects
FY21 USACE Galveston District, FY21 Houston Ship Channel Oyster Mitigation, Harris County, Texas
Term Contract
Design
$10,000,000 to $25,000,000 est. value
Houston, TX

Construction of the Lake E Phase 2 and Lake H to Serve Pomona
Infrastructure
Bidding
TX

Construction of Water, Sewer and Drainage Improvements for Mustang Crossing Section 7
Infrastructure
Bidding
Alvin, TX

Reinforced Concrete Storm Sewer Box Culverts Annual Contract
Term Contract
Post-Bid
Pearland, TX 77581

Mustang Bayou Bank Repair at National Oaks Park
Post-Bid
Alvin, TX 77511

Freeport Harbor Levee Stabilization Wall Project
Results
Freeport, TX 77541

Holiday Lakes Flood and Drainage Improvements
Results
$671,062 est. value
Angleton, TX 77515

Canal System Restoration Project Site Group IV
Infrastructure
Bidding
$2,000,000 est. value
TX

Piper Road Drainage Project
Post-Bid
Pearland, TX

Water Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Savannah County Road 58 Phase V
Results
TX

CDBG-DR Drainage and Paving Improvements
Post-Bid
Holiday Lakes, TX

Manvel Town Center Public Detention Ponds Phase 1A and Manvel Town Center Public Utilities Phase 1A
Results
TX

Drainage Improvements Project Phase I
Infrastructure
Post-Bid
Houston, TX

Big Island Lake to Serve Pomona and Water, Sanitary Sewer and Drainage Facilities With Alternate Paving and Appurtenances to Serve Pomona Section 17
Results
Less than $1,990,655 est. value
TX

Repair and Rehabilitation of the Caroline Tunnels for Harris County Precinct 2
Infrastructure
Post-Bid
Houston, TX

Last Updated 09/15/2021 02:42 PM
Project Title

Mustang Bayou Bank Repair at Bayou Drive

Physical Address View project details and contacts
City, State (County) Alvin, TX 77511   (Brazoria County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes repairs to the banks of Mustang Bayou parallel to Bayou Drive, approximately 240' south of the East House Street intersection. The work consists of installing approximate 30 linear feet of sheetpile wall with sheet pile tie backs, slope stability repairs utilizing geotextile, riprap, hydromulch seeding and anchored sodding. The project also consists of sidewalk repairs, and pedestrian handrail extension.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents