Similar Projects
Retrofit: Ridgeway Road- City of Monroe
Infrastructure
Conception
$450,000 CJ est. value
Monroe, WI 53566

Retrofit: 30th Street Pond- City of Monroe
Infrastructure
Conception
$480,000 CJ est. value
Monroe, WI 53566

Green County Human Services Brick House
Addition, Demolition, Renovation, Infrastructure
Bidding
$201,306 CJ est. value
Monroe, WI 53566

Demolition of an Existing Garage
Demolition, Infrastructure
Bidding
$500,000 CJ est. value
Monroe, WI 53566

New Building for New Glarus Primary School
New Construction, Infrastructure - 76,665 SF
Post-Bid
$14,000,000 CJ est. value
New Glarus, WI 53574

Addition and Renovation to New Glarus Middle and High School
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$14,000,000 CJ est. value
New Glarus, WI 53574

Monroe Country Club Stormwater Improvements
Infrastructure
Results
$393,000 CJ est. value
Monroe, WI 53566

Monroe Municipal Airport
Infrastructure
Results
$293,551 CJ est. value
Monroe, WI 53566

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Willow Way Pond - City of Monroe
Infrastructure
Conception
$500,000 CJ est. value
Monroe, WI 53566

Construction of an Addition
Addition, Demolition, Infrastructure
Bidding
Monroe, WI 53566

Alphorn Ford Renovations
Demolition, Build-out, Renovation, Infrastructure - 27,854 SF
Post-Bid
$2,000,000 CJ est. value
Monroe, WI 53566

Generator Well #4- City of Monroe
Infrastructure
Conception
$390,000 CJ est. value
Monroe, WI 53566

2023 Road Maintenance
Infrastructure
Post-Bid
$300,000 CJ est. value
New Glarus, WI 53574

Reservoir Replacement Well #5 - City of Monroe
Infrastructure
Conception
$500,000 CJ est. value
Monroe, WI 53566

Last Updated 07/21/2023 11:04 AM
Project Title

New High School - Monroe School District

Physical Address View project details and contacts
City, State (County) Monroe, WI 53566   (Green County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $88,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope of work has not been determined. As of July 21, 2023, this project is in the conceptual. An architect has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to June 2024.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents