Similar Projects
Otsego 2021 Street Renewal
Infrastructure
Bidding
$525,000 est. value
Otsego, MN

Skatepark, Bike Park, Pump Track Solutions
Term Contract
Post-Bid
Less than $15,000,000 est. value

2021-A Street Overlay
Post-Bid
Monticello, MN

2020 Stormwater Improvements
Results
Monticello, MN 55362

2021 Seal Coating
Results
MN

2021 Street Improvements Project
Post-Bid
Maple Lake, MN

Wright County Parks and Recreation (Collinwood Regional Park Paving Improvements)
Results
Cokato, MN 55321

North Smoky Hills Graveling
Renovation
Post-Bid

2021 Pavement Preservation
Results
MN

2021 Street Maintenance Project
Results
$165,000 est. value
Otsego, MN

2021 Street Micro-Surfacing Project
Results
$373,000 est. value
Otsego, MN

City of Central Park Development - Phase 2 - Splash Pad
Results
$274,680 est. value
Howard Lake, MN

Central City Road and Utility - Phase 2
Results
MN

Fenning Avenue Reconstruction
Results
$5,000,000 est. value
Monticello, MN 55362

2021 Tennis Court Reconstruction at Buffalo High School
Results
Buffalo, MN 55313

Last Updated 06/02/2021 03:24 PM
Project Title

Otsego 2021 Trail Improvement

Physical Address View project details and contacts
City, State (County) Otsego, MN   (Wright County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal BIT Pavement 4671 SY Remove Culvert 91 LF Relocate Hydrant (All Inclusive) 5 EA Aggregate Base Class 5 Mod 581 TON ADA Ramps (includes truncated domes) 9 EA Type SP 9.5 Wearing Course Mixture (2,B) 2,016 TON Type SP 9.5 Wearing Course Mixture (2,B) Driveways 30 TOn Common Excavation 277 CY Common Borrow 606 CY Traffic Control 1 LS Silt Fence, Type MS 2,000 LF Turf Establishment (Hydro Mulch Matrix + 25-131 Seed) 0.70 Acre Casting Assembly 3 EA Special Ditch Grading 625 LF Storm Drain Inlet Protection 1 EA Connect to Existing storm Sewer 2 EA 15 IN CMP Apron 2 EA 15 IN HDPE Pipe Sewer 265 LF Construct Drainage Structure Design 27 IN 1 EA Construct Drainage Structure Design 48-4020 2 EA

Details

Park/Playground, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents