Similar Projects
Last Updated | 03/24/2022 12:51 PM |
Project Title | Regional WWTP and Collection System - General Construction |
Physical Address | View project details and contacts |
City, State (County) | East Earl, PA (Lancaster County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract No. 1 – General Construction: This project consists of the installation of a 0.410-MGD SBR wastewater treatment plant with a headworks building and control building and associated facilities; as well as installation of 2 pumping stations and upgrades to an existing pumping station. as shown in the Drawings and described in the Contract Documents. Contract No. 2 – General Construction: This project consists of the installation of approximately 40,000 linear feet of gravity, low pressure, and force main sanitary sewer piping, low pressure and gravity sanitary sewer lateral installation, 91 collection & conveyance system manholes; manhole lining, and 115 simplex and 46 duplex grinder pump stations, traffic Control, and related temporary and permanent lawn and paving restoration, as shown in the Drawings and described in the Contract Documents. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details | Sewage Treatment Plant, New Construction, Lift and Pump Stations, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |