Similar Projects
Wastewater Treatment Plant Rehabilitation Project - General/Process Mechanical
Renovation, Alteration
Bidding
$2,100,000 to $2,300,000 est. value
Girardville, PA 17935

UV Disinfection System and Building - General Construction
New Construction
Bidding
Philipsburg, PA

General Construction Site I Clarifier Equipment Removal and Replacement Project
Post-Bid
North East, PA

Stormwater Pond Maintenance II
New Construction
Post-Bid
Wexford, PA 15090

Wastewater Treatment Plant Upgrade General
Results
$22,500,000 est. value
Rochester, PA 15074

Wastewater Treatment Plant Upgrade - General Construction
Results
$5,840,000 est. value
Westfield, PA 16950

Sixth and Canal Pump Station Phase II Upgrade Project - Contract 1 - General Construction
Construction
$6,000,000 to $8,500,000 est. value
Reading, PA 19601

LTTTJMSA Wastewater Treatment Plant (WWTP) - General Construction
Construction
$3,941,500 est. value
Tunkhannock, PA

Rehabilitation Of The Benson Wastewater Treatment Plant (WWTP)
Renovation
Bidding
Johnstown, PA

Bethany Village Senior Living Center Sewage Treatment Plant
New Construction
Post-Bid
Lakeville, PA 18438

Pump Station No.1 Interceptor Sewer Lining and Manhole Repair Project
Results
$151,901 est. value
Carlisle, PA 17013

Wastewater Treatment Plant Phase II - General Construction
Construction
$6,250,000 to $7,250,000 est. value
Greencastle, PA 17225

Wastewater Treatment Plant Ultraviolet Disinfection System Addition - General Construction
Renovation
Bidding
$1,600,000 est. value
Lansdale, PA 19446

Tanker Filling Station
Post-Bid
Renovo, PA

Shoreline Pump Station
Results
Erie, PA 16500

Last Updated 03/24/2022 12:51 PM
Project Title

Regional WWTP and Collection System - General Construction

Physical Address View project details and contacts
City, State (County) East Earl, PA   (Lancaster County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. 1 – General Construction: This project consists of the installation of a 0.410-MGD SBR wastewater treatment plant with a headworks building and control building and associated facilities; as well as installation of 2 pumping stations and upgrades to an existing pumping station. as shown in the Drawings and described in the Contract Documents. Contract No. 2 – General Construction: This project consists of the installation of approximately 40,000 linear feet of gravity, low pressure, and force main sanitary sewer piping, low pressure and gravity sanitary sewer lateral installation, 91 collection & conveyance system manholes; manhole lining, and 115 simplex and 46 duplex grinder pump stations, traffic Control, and related temporary and permanent lawn and paving restoration, as shown in the Drawings and described in the Contract Documents.

Details

Sewage Treatment Plant, New Construction, Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents