Similar Projects
Tabor-Crowall - Brodell Constructability Review
Term Contract
Design
$100,000 est. value
WA

Tabor Crowall Brodell CM&I
Term Contract
Design
$250,000 est. value
WA

RFP - Project Control Consulting Services
Term Contract
Bidding
Seattle, WA 98164

RFP - Pavement Condition Assessment
Term Contract
Bidding
Issaquah, WA 98027

Construction Management Services for Fall City Floodplain Restoration Project
Infrastructure
Post-Bid
Fall City, WA

Work Order Construction Management and Inspection Services for MTD SGR
Infrastructure
Post-Bid
WA

Construction Management And Inspection For RapidRide I Line
Infrastructure
Results
$3,035,000 est. value
WA

Construction Management and Inspection Services for Eastlake Layover Facility
New Construction, Alteration
Results
Seattle, WA

San Souci Road Elevation CM&I
Term Contract
Design
WA

RFP - Baggage Optimization Phase 3 ATR
Term Contract
Bidding
$1,500,000 CJ est. value
Seattle, WA 98164

On Call South Fork Tolt River Consultant Inspection Services
Term Contract
Post-Bid
Seattle, WA

Fort Dent CM&I
Term Contract
Design
$250,000 est. value
WA

RFP - Owner Advisory, Construction Management and Related Services for West Point Treatment Plant Electrical Improvements
Term Contract
Bidding
$7,000,000 CJ est. value
Seattle, WA 98164

Waste Monitoring Services
Infrastructure
Post-Bid
Seattle, WA

Candlewood
Term Contract
Design
$400,000 est. value
WA

Last Updated 08/23/2022 02:03 AM
Project Title

RFQ - On-Call Value Analysis / Value Engineering

Physical Address View project details and contacts
City, State (County) Bellevue, WA 98004   (King County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Cascade intends to select one or more firms based on this RFQ process to perform a variety of value analysis/value engineering tasks as may be assigned by Cascade at Cascade's White River Lake Tapps Reservoir Project, on Cascade-owned drinking water transmission main(s), and Cascade-owned wholesale master meters. The successful firm will utilize the value management methodology as described by Society for the Advancement of Value Engineering ("SAVE") and will employ Certified Value Specialist ("CVS") to lead the Value Analysis and Value Engineering Studies. The successful firm must demonstrate extensive experience and knowledge in the practice of SAVE International's formal value management methodology. The consulting firm will retain the services of innovative, experienced, independent subject matter experts who work effectively in a creative team-based, workshop-style setting to populate the Value Management team. The Certified Value Specialist facilitating Studies for Cascade must understand and employ the following principles and be able to effectively communicate them to Cascade staff and project teams, as well as independent subject matter experts. Questions should be directed only to: Henry Chen Capital Projects and Engineering Director Telephone number: (425) 283-0367 Email address: hchen@cascadewater.org Questions must be submitted to the individual named above no later than: August 17, 2022 at 4:00pm The method of Contractor Selection has not been Determined at this time.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents