Project Title | Chama Basin Trail Bridge |
Physical Address | View project details and contacts |
City, State (County) | Pagosa Springs, CO 81147 (Archuleta County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $100,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | SCOPE OF CONTRACT The work shall consist of what is shown on the plans, stated in the specifications, and summarized below: Remove trees and clear and grub as required. Excavate for foundation construction. Construct the abutments and wingwalls. Backfill the abutments to just below the beam seat elevation. Grade portions of the channel banks under the new bridge. Install riprap adjacent to the new structure. Erect the steel girders. Construct the bridge. Construct the remaining backfill and the approach embankments. Install the approach rails. Perform all work to required to construct aggregate surface. Open the new bridge to traffic. Prepare the finished grading and apply seeding PROJECT LOCATON Chama Basin Trail Bridge: The trail bridge will be located on a Forest Service Trail (FST) 738, which accesses the Rio Grande National Forest. The Chama Basin Trail Bridge No. 738-0.1 located on the Conejos Ranger District of the Rio Grande National Forest, Latitude 37.03497326, Longitude -106.5533922. Directions: From Chama, NM travel north on Highway 17 to the Chama River Road (FSR 121), turn left onto FSR 121, travel about 6 miles north to the Rio Grande NF boundary. Take the left fork about one mile to the new bridge location. MAGNITUDE OF CONSTRUCTION PROJECT The estimated price range of the project is between $25,000-$100,000 SITE VISIT Date: September 7, 2022 Time: 1400____________ Location: The coordinates are 37.032446N 106.554W and the directions are: From Antonito, CO, drive South on CO-17 S for 39 miles, continue on NM- 17 S for 3 miles, turn right on Co Rd 455/FSR-121, follow signs for Chama Basin Trailhead, approximately 6 miles. Period of Performance: 09/19/2022 to 07/31/2023 |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |