Similar Projects
Dock/Pier/Marine, Site Development Construction Project Lead, Key West Nas, FL 33040 (Monroe County)
Last Updated | 05/16/2023 03:04 AM |
Project Title | Rock Harbor Breakwater Repair and Seaweed Barrier System Water Quality Improvement Project |
Physical Address | View project details and contacts |
City, State (County) | Key West Nas, FL 33040 (Monroe County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dock/Pier/Marine, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The purpose of the project is to repair the breakwater and add the air curtain and seaweed prevention system. During Hurricane Irma, the storm surge toppled the boulders over the breakwater, which prior to the storm was providing a significant level of resiliency and storm surge protection to the homes. With the breakwater structure now severely damaged, this low-lying subdivision is subject to frequent and persistent flooding due to storms, astronomical high tides, and sea level rise. The repair activities are to be completed to return the breakwater structure to its previous condition prior to Hurricane Irma. In addition, the breakwater provided a barrier to the heavy loading of floating seaweed coming in from the ocean during the extreme heat of the summer that now clogs the canals, causing severe water quality problems, respiratory and health issues and environmental disaster. Repairing the breakwater and adding the air curtain and seaweed prevention system will help maintain better water quality in the canal systems near the breakwater, helping residents avoid respiratory distress and other health problems. No Pre-Bid Conference Available Your subject line on both emails must read as follows: Rock Harbor Breakwater Repair & Seaweed Barrier 05-23-2023 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |