Similar Projects
Pascagoula High School Intercom Replacement
Renovation
Sub-Bidding
$850,000 CJ est. value
Pascagoula, MS 39567

2021 Contract Tracing / Security Camera Systems
Alteration
Post-Bid
Hattiesburg, MS

Procurement of Equipment for Totalcard Access Control System
Alteration
Post-Bid
Senatobia, MS

Install Lenel HSPD-12 Compliant Physical Access Control System (ePACS) - Poplarville, MS
Term Contract
Results
Poplarville, MS 39470

Fiber Optic Cable Installation to Various Facilities
Term Contract
Results
$500,000 to $1,000,000 est. value
Biloxi, MS 39534

Upgrade of Existing Cameras
Alteration
Post-Bid
Lorman, Natchez, Vicksburg, MS 39096

6515--Audiovisual System
Alteration
Results
Pensacola, FL - Biloxi, MS 32507

MGCCC Arena AV Package
Alteration
Post-Bid
Perkinston, MS 39573

Provide, Install, and Maintain 10GB Ethernet
Term Contract
Results
Pensacola, FL - Kiln, MS 32507

Telops Multispectral Infrared Camera and Accessories
Alteration
Post-Bid
University, MS

Intercom System Install
Alteration
Results
$168,886 est. value
Kiln, MS

2021 IP Phone District-Wide Project
Alteration
Post-Bid
MS

AV Upgrades
Alteration
Results
Fulton, MS

IP School Intercom Project
Alteration
Post-Bid
Tishomingo, MS

Sewer and Drainage Video Camera
Alteration
Results
$112,813 est. value
Pascagoula, MS

Last Updated 04/17/2023 08:29 AM
Project Title

Fiber Installation from ITB 230 to B110

Physical Address View project details and contacts
City, State (County) Columbus, MS 39705   (Lowndes County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This SOW defines the requirement for the Contractor to engineer, furnish, install and test (EFI&T) 12-strand single mode (SM) fiber optic cables (FOC) from Information Transfer Building (ITB) 230 to Bldg. 110 at Columbus AFB, MS. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished. SCOPE. This SOW defines the requirement for the Contractor to engineer, furnish, install and test (EFI&T) 12- strand single mode (SM) fiber optic cables (FOC) from Information Transfer Building (ITB) 230 to Bldg. 110 at Columbus AFB, MS. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished. 2.0 REQUIREMENTS. 2.1 GENERAL REQUIREMENTS. 2.1.1 Safety Requirements. The contractor shall comply with all Federal, State, county, and base security and safety laws, regulations, policies, and requirements. 2.1.2 Site Coordination. The Contractor shall meet with the base safety officer upon arrival on site for review of the specific safety requirements prior to installation. 2.1.2.1 Confined Space. The Contractors and Sub-contractors entering confined spaces on Columbus AFB, MS are responsible for the safety of their personnel and for their own permit space program as outlined in AFMAN 91-203. All confined space operations must be coordinated with the Base Fire Department prior to start of work. The primary Contractor is responsible for all Sub-contractor confined space operations. 2.1.2.2 Accident/Incident Reporting and Investigation. The Contractor shall record and report all facts relating to each instance of injury to either Contractor or Government personnel. Notification shall be provided to the 14 CS/SCXP Project Manager and the Base Safety Office unless otherwise stated in the SOW. The Contractor shall secure the scene of any accident and wreckage until released by the accident investigative authority through the Base POC. If the Government elects to investigate the incident, the Contractor shall cooperate fully and assist the Government personnel until the investigation is completed

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents