Similar Projects
The Pedestrian Safety and Traffic Circulation Improvements
Renovation, Infrastructure
Bidding
$1,300,000 est. value
Dracut, MA

FY23 Material/Service
Term Contract
Bidding
$250,000 est. value
Bedford, MA

Servicing Traffic Signals
Infrastructure
Post-Bid
$2,400,000 est. value

Street Light and Traffic Signal Supplies
Infrastructure
Post-Bid
Framingham, MA

Littleton High School at King Street (Route 2A/110) Signal Reconstruction
Results
Littleton, MA 01460

Traffic Signs and Related Equipment
Term Contract
Results
Somerville, MA

Traffic Signal Maintenance
Term Contract
Bidding
Bedford, MA

Provide RTC Manufacturing Traffic Signal Supplies
Infrastructure
Post-Bid
Framingham, MA

Traffic Signals Upgrades
Results
$800,000 est. value
Boston, Malden, Medford, Quincy, Somerville, MA

Storm Drain Improvements
Infrastructure
Post-Bid
$1,800,000 est. value
Lexington, MA 02421

Town Center Traffic and Streetscape Improvements
Results
$7,500,000 est. value
Lexington, MA

Roadway Reconstruction and Related Work (Including Signals) on A Section of Union Street
Infrastructure
Post-Bid
$1,139,585 est. value

Deployment of Temporary Traffic Control at Various Locations
Results
$1,450,000 est. value

Guide and Traffic Sign Replacement along a Section of Interstate 84
Infrastructure
Post-Bid
$687,691 est. value

2021 Traffic Signal Improvement Project
Results
$300,000 est. value
Burlington, MA 01805

Reported 05/07/2022 12:00 AM
Project Title

2022 Traffic Signal Maintenance Contract

Physical Address View project details and contacts
City, State (County) Concord, MA   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $93,780
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract is to provide service, maintenance and emergency repair of the traffic signals, Traffic signage, traffic control equipment and alterations that may from time to time be directed by the Town. The contractor shall have available and readily accessible all required tools, equipment apparatus, facilities, skilled labor services and materials to perform all work necessary to maintain the traffic signal facilities in good working order such as but not limited to: outage repairs, emergency pre-emption repair and adjustments, video camera detection repair and adjustments, signal head adjustments, LED lighting retrofits to signal heads, push button installation, repair and adjustments, pedestrian signal head and RRFBs installation , repair and adjustments, electrical cable repair and/or replacement, synchronization, controller troubleshooting and maintenance, etc.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents