Similar Projects
Removal, Handling and Disposal of Drinking Water Treatment Plant Residuals Material and Replacement of Sand Underdrain Media in Lagoon 2
Term Contract, Alteration
Bidding
$200,000 est. value
Lowell, MA 01854

Replacement of Three Boilers at the Muraco Elementary School
Alteration
Bidding
$350,000 est. value
Winchester, MA 01890

Boiler Removal and Replacement
Post-Bid
Hudson, MA 01749

Ball Hall Installation of Dampers
Post-Bid
Less than $65,000 est. value
Lowell, MA

Somerville City Hall Boiler Renovation - General Bids
Term Contract
Results
Less than $668,377 est. value
Somerville, MA 02143

Replacement of Filters at Kennedy Pool
Term Contract
Results
$120,000 est. value
Somerville, MA 02143

Muraco School Boiler Replacement Project
Alteration
Bidding
Winchester, MA 01890

Ditson School Boiler Replacement
Post-Bid
$220,000 est. value
Billerica, MA 01821

Hot Water Heating System Flush and Re-Fill for Dracut Police Station
Results
Dracut, MA

Repair and Maintenance of Refrigeration System at Ice Rink
Post-Bid
Somerville, MA

Boiler Repair
Results
Ayer, MA 01432

Boiler Replacement at Ryan School
Post-Bid
Less than $52,000 est. value
Tewksbury, MA 01876

LaPrise Village Natural Gas Conversion of Existing Steam Boilers
Results
Less than $425,000 est. value
Medford, MA 02155

Region 1 Chiller System Glycol Upgrade
Post-Bid
Less than $25,000 est. value
Maynard, MA 01754

Top of Shafts 6, 8 and 9 Interim Improvements
Results
Less than $4,177,000 est. value
Brighton, Malden, Newton, MA

Reported 07/22/2021 12:00 AM
Project Title

Chiller Controls

Physical Address View project details and contacts
City, State (County) MA   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide one JCI (Johnson Controls Incorporated) currently factory certified technician onsite at Building 1201 (145 Randolph St, Hanscom AFB, MA 01731) Central Plant for 16 hours on consecutive days once a month for a total of 12 months. The Contractor shall perform programming, graphics, and repair of front end issues, calibrate metering IAW manufacturers’ specifications of all sensors, controllers and actuators as directed by the government Central Plant Supervisor and Central Plant Engineer technical representatives.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents