Similar Projects
Rockingham Farms Water and Sewer Extension
Infrastructure
Bidding
Savannah, GA

Highway 297 Industrial Park Sewerage System Improvements
Infrastructure
Bidding
Swainsboro, GA 30401

Subcontractors Sewer Rehab Work
Post-Bid
Sandersville, GA 31082

Harrison Drive and Brown Street Gravity Sewer Improvements
Post-Bid
Gainesville, GA 30501

Disaster Recovery and Sewage Cleaning Services
Term Contract
Results
GA

Site Utilities at Highway 24 and Bypass
Results
Waynesboro, GA 30830

Construction of Walnut Creek Lift Station
Construction
Morrow, GA 30260

Powder Springs Street Improvements Water Sewer Relocation
Infrastructure
Bidding
Marietta, GA 30006

Grease Trap and Septic Service
Post-Bid
Gainesville, GA 30504

2020 Sewer Rehabilitation Project
Results
Dalton, GA

Construction of the Sanitary Sewer System Rehabilitation Program
Term Contract
Bidding
Columbus, GA

McIntyre Sewer System
Post-Bid
McIntyre, GA

Fairground Street Area Roswell Street to Fraiser Street Water and Sanitary Sewer Relocation
Results
Less than $1,772,701 est. value
Marietta, GA 30060

2020 Millen CDBG Project
Infrastructure
Bidding
Millen, GA

Grease Trap Maintenance
Term Contract
Post-Bid
Albany, GA 31702

Last Updated 07/15/2021 08:45 AM
Project Title

Tribble Road Pump Station, Gravity Sewer, and Force Main Project

Physical Address View project details and contacts
City, State (County) Cumming, GA 30028   (Forsyth County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the following Work: Division One - Tribble Road Pump Station: The Project will involve furnishing all materials, labor, and equipment to install one 72 HP Duplex Submersible Pump Station and any appurtenances. Division Two - Tribble Road Gravity Sewer and Force Main: The Project will involve furnishing all materials, labor, and equipment to install approximately 2,750 LF of 10-inch gravity sewer, 2,450 LF of 8-inch gravity sewer and 1,800 LF of 8-inch HDPE force main and 120 LF of Cased Jack & Bores and any appurtenances.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents