Similar Projects
Hemphill Creek 12-inch, 24-inch, 27-inch Wastewater Main - 564 - City of San Marcos
Infrastructure
Conception
$8,400,000 est. value
San Marcos, TX

Harris Hill Road Water Line - 660 - City Of San Marcos
Alteration
Conception
$1,300,000 est. value
San Marcos, TX 78666

Commercial Kitchen
Demolition, New Construction, Infrastructure - 3,536 SF
Design
$1,342,000 CJ est. value
Dripping Springs, TX 78620

Widen Road - Add Lanes and Shoulders - FM 621
Infrastructure
Bidding
$2,765,187 CJ est. value
San Marcos, TX 78666

RM 12 - Widen Road - Add Lanes
Infrastructure
Bidding
$4,135,673 CJ est. value
San Marcos, TX 78666

FM 2001 - Crack Seal
Infrastructure
Sub-Bidding
$288,528 CJ est. value
Buda, TX 78610

Sunfield Wastewater Treatment Plant (WWTP) Expansion to 0.99 MGD AW and GBRA - Package 2
New Construction, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Buda, TX 78610

Kissing Tree West Centerpoint Road - Phase 2B
Infrastructure
Post-Bid
San Marcos, TX 78666

Sunfield Phase 5 Section 1A, Section 1B, and Section 2 Grading Improvements; Sunfield Phase 5 Section 1A, Section 1B, and Section 2 Street, Drainage, Water, Wastewater, and Utility Improvements
Infrastructure
Post-Bid
Buda, TX

World-Wide Water Storage Tank Remediation
Term Contract
Results

Right-Of-Way Acquisition Service
Results
San Marcos, TX 78666

Wimberley Square
New Construction, Infrastructure - 3,223 SF
Pending Verification
$850,000 CJ est. value
Wimberley, TX 78676

Mockingbird Hills Subdivision Improvement - 509 - City of San Marcos
Infrastructure
Conception
$8,420,000 est. value
San Marcos, TX 78666

Francis Harris Lane - Low Water Crossing
Infrastructure
Bidding
$200,000 est. value
San Marcos, TX 78667

Sunfield Wastewater Treatment Plant (WWTP) Expansion to 0.99 MGD AW and GBRA - Package 8
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Buda, TX 78610

Last Updated 07/25/2022 04:06 PM
Project Title

Old Black Colony Elevated Tank/Line Extention - W11 - City of Buda

Physical Address View project details and contacts
City, State (County) Buda, TX 78610   (Hays County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $7,650,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

City would need to acquire approximately 1 acre of land for this project. Utility improvements are necessary to keep up with demand and pressure for a growing system at the entry point for Alliance Regional Water Authority water into our system. Construction of the following items are included: 0.5-1 Million Gallon Elevated Storage Tank to help relieve demand off Beacon Hill Tower ($3,590,700), install 1,000 linear feet of 12" water line along FM 1626 to Elm Grove Elementary School to create redundancy and improve distribution system operations ($505,000), and upsize to 16" approximately 465 linear feet of water line to Whispering Hollow Subdivision REPLACES W06, W0O7 and W11. As of July 25, 2022, a designer has been selected. No firm timeline has been established for the construction. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents