Similar Projects
New Canada Road 24" Main
Infrastructure
Bidding
Lakeland, TN 38002

Annual Commercial and Fire Backflow Inspection Services
Term Contract
Bidding
Alcoa, TN

CDBG 2019 Wastewater Collection Improvements
Post-Bid
Rockwood, TN

Moccasin Bend WWTP Equalization Basin And Blower Replacement Improvements
Post-Bid
Chattanooga, TN 37405

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2019 CDBG Imminent Threat Water Line Extensions
Infrastructure
Bidding
$475,000 est. value
Elizabethton, TN 37643

Water and Sewer Line Replacement
Post-Bid
$180,000 to $220,000 est. value
Jellico, TN

Purchase of AMR Style Water Meters
Results
Signal Mountain, TN 37377

Watt Cemetary Road - 1MG Tank and Water Main
Infrastructure
Bidding
Loudon, TN 37774

Fire Hydrants, Valves, and Parts Replacement
Term Contract
Post-Bid
TN

2020 Red Bank Sewer Rehabilitation
Results
Red Bank, TN

2020 McMinn County CDBG Waterline Extensions
Infrastructure
Bidding
Riceville, TN

Raulstontown Road Water Main
Post-Bid
South Pittsburg, TN 37380

Snow Hill Road Force Main Repair Phase 1
Results
Less than $77,850 est. value
Chattanooga, TN

Reported 08/20/2021 12:00 AM
Project Title

Downtown Water Mains - Phase I, Phase 2, and Phase 3

Physical Address View project details and contacts
City, State (County) Morristown, TN   (Hamblen County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1: 1. Approximately 350 L.F. new 8” D.I.P. water main. 2. Excavation for connections to existing 6” water mains. 3. Pavement repair and overlay with replacement of pavement markings damaged by the construction. 4. Other items required for a complete, functional installation. Phase 2: 1. Approximately 470 L.F. of 8” D.I.P. water main 2. Excavation for connections to existing 6” water mains. 3. Pavement repair and overlay with replacement of pavement markings damaged by the construction. 4. Other items required for a complete, functional installation. Phase 3: 1. Approximately 360 L.F. of 8” D.I.P. water main 2. Excavation for connections to existing 6” water mains. 3. Pavement repair and overlay with replacement of pavement markings damaged by the construction. 4. Other items required for a complete, functional installation.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents