Similar Projects
N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

Replace Campus Boilers - Five Buildings
Alteration
Bidding
$850,000 est. value
Alamosa, CO 81101

Boiler Replacement at Remington Building
Alteration
Bidding
Lakewood, CO 80215

AFB 2141 CC 2018 Hail Damage Repairs
Post-Bid
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

Rangeview Boiler Replacement
Post-Bid
Aurora, CO 80013

SB267 Replace Boiler Economizer, Central Plant, CMHIP
Results
Less than $40,000 est. value
Pueblo, CO 81003

16" Sleeve Valve and Spool Refurbishment
Results
Berthoud, CO 80513

Water Heater Replacement
Alteration
Bidding
Denver, CO 80228

Greeley Central HS Boiler and DHW Replacements
Post-Bid
Garden City, CO 80631

SB267 Repairs/ Upgrades to Mechanical and Electrical Systems-Three Troop Offices / Adams
Results
$158,200 est. value
Commerce City, CO 80022

Cu Anschutz Pn19-129407-Scpp Pre-Qualified Only
Post-Bid
Less than $220,238 est. value
Denver, CO

Refurbish Hydronic Heat System at Johnson Building
Results
Rangely, CO 81648

Elevator and Conveyance Inspection Services
Post-Bid
Brighton, CO

As-Needed HVAC, Mechanical and Plumbing Services
Term Contract
Results
Aspen, CO 81611

Last Updated 07/14/2021 06:30 AM
Project Title

Design-Build - Installation of Owner Provided Boiler Units

Physical Address View project details and contacts
City, State (County) Pueblo, CO 81001   (Pueblo County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of work includes design, engineering, and installation of two Owner provided PK Model N-1700 units. Remove two existing Peerless cast iron boilers from site; including disconnection of piping, gas line, venting, electrical and controls. Place and set (2) Owner furnished PK Model N-1700 Units Removal and disposal of existing vents up to main horizontal 24” single wall vent. Piping through the roof will remain in place. Cap two of the four existing openings on the horizontal main vent. Provide labor and equipment to move two owner provided boiler units from the Service Center to the Park View boiler room to be placed on existing pad. Reconnect boilers to heating water loop, natural gas, natural gas regulator vent and exhaust vent. Install two owner provided gas valves, two owner provided boiler circulation pumps, electrical supply to boilers, electrical supply to new boiler circulation pumps and all controls from boiler to gas valves. Insulation of new piping and any piping disturbed due to replacement of boiler. Start-up of units. Perform factory start-up of used boilers with a PK certified technician. Replace one heating loop expansion tank, Inspections by state boiler division, Permit.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents