Similar Projects
Project Phoenix - Phase II
Addition - 120,000 SF
Conception
York, PA 17408

Advanced Fluid Systems
New Construction - 22,500 SF
Design
York, PA 17401

Pequa Valley Farm Commercial
Addition - 547 SF
Design
$150,000 est. value
Delta, PA 17314

Fedex Maintenance Building and Vehicle Wash Bay
Renovation
Post-Bid
York, PA 17401

New Municipal Complex - General Construction
New Construction
Post-Bid
Glen Rock, PA 17327

Aluminum Equipment Shelter
Results
Less than $44,785 est. value

Metal Pole Barn Building
New Construction - 4,032 SF
Results
$50,000 to $60,000 est. value
Hanover, PA 17331

Goodman Logistics Center
New Construction - 1,846,028 SF
Construction
$1,000,000 est. value
Lewisberry, PA 17339

Codorus Quarry Industrial Building
New Construction - 354,514 SF
Construction
$1,500,000 est. value
York, PA 17406

Life Storage
Renovation - 126,000 SF
Pending Verification
York, PA 17402

Expressway Commerce Center
New Construction - 673,920 SF
Pending Verification
$10,000,000 CJ est. value
York, PA 17406

Weavers of Wellsville
Addition - 5,240 SF
Design
$325,000 est. value
Wellsville, PA 17365

Salt Storage Building Replacement
Renovation
Results
Wrightsville, PA 17368

3625 Mia Brae Lp
New Construction - 111,600 SF
Construction
$1,000,000 est. value
York, PA 17405

Tractor Supply
New Construction - 24,091 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Goldsboro, PA

Reported 09/18/2021 12:00 AM
Project Title

Logistics 83 - Phase I

Physical Address View project details and contacts
City, State (County) York, PA 17406   (York County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Warehouse/Storage
Contracting Method Bids by Invitation.
Project Status Bidding, Construction Start Expected fourth quarter 2021, Construction Completion Expected fourth quarter 2022
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Industrial Warehouse, 1 Story Above Grade, 670,390 SF New Construction, 67 Acres.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents