Similar Projects
GAOA Grand Mesa and Erickson Toilets Replacement for The Grand Mesa, Uncompahgre, and Gunnison
Demolition, Term Contract
Design
$250,000 to $500,000 est. value
Grand Mesa, Gunnison, CO

GAOA Grand Mesa and Erickson Toilets Replacement for The Grand Mesa, Uncompahgre, and Gunnison
Demolition, Term Contract
Design
$250,000 to $500,000 est. value
Grand Mesa, Gunnison, CO

East Nottingham Park Improvements
Renovation - 3,400 SF
Bidding
$10,000 est. value
Avon, CO 81620

East Park Improvements and North Restrooms, Harry a. Nottingham Park
New Construction
Bidding
$40,000 est. value
Avon, CO 81620

Rodarte Kitchen and Restroom Remodel
Renovation
Post-Bid
Greeley, CO 80631

Lyft
Renovation - 173 SF
Post-Bid
Denver, CO 80204

Affolter Park Upgrades
Results
$600,000 to $700,000 est. value
Longmont, CO 80501

Clear Creek High School Site Improvement
Results
$1,850,000 est. value
Evergreen, CO 80439

LifeTime Fitness
New Construction - 109,000 SF
Pending Verification
$10,000,000 CJ est. value
Castle Pines, CO 80108

Golden Gate Canyon State Park - Vault Toilet Phase 2
New Construction
Bidding
$250,000 est. value
Golden, CO 80403

Sunshine/Ouray Toilet Replacement
Renovation, Demolition
Post-Bid
Ouray, CO

Pikes Peak Center Restrooms ADA Renovation
Renovation
Results
Less than $88,686 est. value
Colorado Springs, CO 80903

Design Build Main Park Restroom Design and Construction
New Construction
Bidding
$200,000 est. value
Windsor, CO 80550

Citizens Park Restrooms Remodel
Renovation
Post-Bid
$150,000 est. value
Idaho Springs, CO 80452

Construction of the Bear Creek Regional Park Restroom
Results
Colorado Springs, CO 80904

Last Updated 07/01/2022 08:41 AM
Project Title

Ada Improvements to Restrooms at Wichita Lot

Physical Address View project details and contacts
City, State (County) Manitou Springs, CO 80829   (El Paso County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Install restroom equipment: a. 3 new toilets (toilet seat measuring 17-19 inches above floor) b. 3 new toilet stall petitions with doors c. 6 stainless grab bars i. 2 in each stall ii. 1 at the rear of the stall iii. 1 to the side of the stall, if possible iv. 36 inches from the finished floor surface. d. 2 sinks - 34 inches from the floor with a knee clearance of 27 by 30 inches wide and 11 to 25 inches deep e. 2 soap dispensers - 39 inches above floor surface f. urinal in men’s restroom i. 17 inches above the finish floor surface ii. 13 1/2 inches deep minimum measured from the outer face of the urinal rim to the back of the fixture g. 2 touchless hand dryers - 40-48 inches above floor surface, and h. 2 stainless reflective mirrors - bottom of mirror 40 inches above floor surface. 2. Install 2 new intermittent exhaust fans, motion sensor controlled with backdraft damper. 3. Install 2 wall mounted electric heaters. 4. New LED lighting fixture in each restroom. 5. New flooring with skid proof surface, turned up edge at walls, such as acrylic flake with integral cove base. Maintain floor drains in both restrooms. 6. Install 1/ 120-volt GFI receptacle in each restroom (surface mount conduit okay). 7. Install new, lockable metal doors on each restroom comparable to existing doors. 8. Patch and paint all walls and ceiling with city selected color. 9. Install Federal ADA-compliant men’s and women’s accessible restrooms signs near entrance of each restroom. 10. Install ADA approved concrete or metal ramp at bathroom entrance. 11. One restroom must remain open to serve the public while the other restroom is being upgraded.

Details

Restroom/Bath House, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents