Similar Projects
Last Updated | 09/21/2022 08:46 AM |
Project Title | Linn County Secondary Roads District #1 Shop - Phase 1 |
Physical Address | View project details and contacts |
City, State (County) | Palo, IA 52324 (Linn County) |
Category(s) | Education, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Elementary School, Middle/Senior High School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work for the public improvement project consists of and is limited to: Phase 1 site improvements for Linn County Secondary Roads District #1 Shop. Phase 1 work will include minor demo and clearing and grubbing. Improvements will include topsoil stripping and placement of site cut/fill (earthwork), installation of storm sewer, storm intakes, and roof drain tile, and construction of a detention basin with outlet structure and necessary armoring. Site Improvements will include placing macadam stone for drive and construction entrance. Temporary and Permanent Erosion Control will also be included in this package. Project Location: 2300 Block Covington Road, Palo, IA 52324 The Work of Project is defined by the Contract Documents and consists of the following: This public improvement consists of work that includes but is not limited to: Phase 1 site improvements for Linn County Secondary Roads District #1 Shop. Phase 1 work will include minor demo and clearing and grubbing. Improvements will include topsoil stripping and placement of site cut/fill (earthwork), installation of storm sewer, storm intakes, and roof drain tile, and construction of a detention basin with outlet structure and necessary armoring. Site Improvements will include placing macadam stone for drive and construction entrance. Temporary and Permanent Erosion Control will also be included in this package. |
||||||||||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, 392,058 SF.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |