Similar Projects
Airport Site Development
Infrastructure
Conception
Gulfport, MS

Choctaw County Schools: Football Stadium
Infrastructure
Design
$70,000 CJ est. value
Ackerman, MS 39735

Landers Center Expansion
Addition, Demolition, Renovation, Infrastructure - 175,000 SF
Design
$35,000,000 CJ est. value
Southaven, MS 38671

Waveland Pole Barn Replacement - Rebid
Demolition, New Construction, Infrastructure
Bidding
$220,000 CJ est. value
Waveland, MS 39576

Repairs And Renovations: Coahoma County School District Lyon, Jonestown, Friars Point Elementary Schools
Renovation
Bidding
$6,129,000 CJ est. value
Clarksdale, MS 38614

F.B. Woodley Elementary School Interior Repairs and Exterior Repairs
Renovation
Post-Bid
Hattiesburg, MS

St. Martin Restroom Renovations
Renovation
Post-Bid
Biloxi, Ocean Springs, MS 39532

Weymouth Hall EWP Project - City of Natchez
Results
$150,098 est. value
Natchez, MS 39120

Boyd Elementary School Restroom Renovations
Renovation
Results
Jackson, MS 39206

Jiffy Lube / D'iberville
New Construction, Infrastructure - 3,438 SF
Construction
$1,500,000 CJ est. value
Diberville, MS 39540

Velocys Bayou Fuels Project - Belwood Industrial Park
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Natchez, MS 39120

Parts Distribution Center - Navistar International Corp. / Olive Branch
New Construction, Infrastructure - 300,000 SF
Pending Verification
$10,000,000 CJ est. value
Olive Branch, MS 38654

Silo Square - Phases 3 and 4
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Southaven, MS 38672

Love's Travel Stop - Lucedale
New Construction, Infrastructure - 6,836 SF
Bidding
$1,800,000 CJ est. value
Lucedale, MS 39452

Repair and Maintenance Unit Price Project
Infrastructure
Post-Bid
Gulfport, MS

Last Updated 09/23/2022 12:35 AM
Project Title

Site Improvements to Bramlett Elementary

Physical Address View project details and contacts
City, State (County) Oxford, MS 38655   (Lafayette County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $2,456,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

All proposals must be on file with Oxford School District prior to the opening time as stated above. All proposals must be sealed and clearly marked on the outside of the envelope as indicated "Site Improvements to Bramlett Elementary" to be opened on {insert bid date here}. Envelopes not so marked are submitted at the risk of the Bidder and the School District assumes no responsibility for the premature opening of same by any School District employee. Each bidder must deposit with his bid (or upload at Bidders Option), security in the amount, form and subject to the conditions provided in the Instructions to Bidders. Performance and Payment Bonds will be required from the successful bidder. Bidders shall comply with law of the State of Mississippi requiring Certificate of Responsibility. Resident contractors shall, in accordance with laws of the State of Mississippi, be granted preference over non-residents in the award of this contract in the same manner and to the same extent as provided by the laws of the state of domicile of the non-resident. A non-resident contractor shall attach to his proposal a copy of his resident state's current law pertaining to such state's treatment of non-resident contractors. The successful bidder must adhere to the Owner's policy concerning non-discrimination without regard to race, creed, color, age, sex, national origin or handicap. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. Time is an important consideration on the project. The project shall be substantially complete by July 15, 2023

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents