Similar Projects
CCSWDC Scale Replacement and Access Improvements
Infrastructure, Alteration
Bidding
$7,318,218 est. value
Sarasota, FL

Retention Wall Repairs at Laurel Oaks Reclaimed Water Storage Ponds
Post-Bid
Less than $25,000 est. value
Sarasota, FL 34240

Geosynthetic Liner Repair
Post-Bid
Venice, FL 34293

Lyons Bay Channel Dredging Project and Erosion Control Additions at Snake Island
Results
Venice, FL

Talbot Street and Talbrook Road at Maryland Street Drainage Improvements
Results
North Port, FL 34287

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Retention Wall Maintenance
Results
Less than $100,000 est. value
Sarasota, FL 34240

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Shoreline Rehabilitation
Results
Less than $115,154 est. value
Sarasota, FL 34230

Price Boulevard Sidewalk
Results
North Port, FL 34288

West Dearborn Street Improvements
Results
FL

Judicial Parking Lot
Results
$405,768 est. value
Sarasota, FL 34237

Canal and Drainage System Maintenance and Clearing
Term Contract
Results
Sarasota, FL

Bike Lane/Sidewalk/Milling and Resurfacing/Drainage Improvements/Lighting
Infrastructure
Results
$5,701,109 est. value
FL

Benjamin Franklin Lighting - Sidewalk Improvements Phase 2A
Term Contract, Infrastructure
Results
Sarasota, FL

Last Updated 12/14/2021 12:25 PM
Project Title

Design/Build Ringling Trail

Physical Address View project details and contacts
City, State (County) Sarasota, FL 34235   (Sarasota County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To install protected bicycle lanes on Ringling Blvd. from Lime Ave. to Pineapple Ave, striping; installing bus stop islands; painting bike lanes green at conflict points; installing bike loop detectors; signal timing adjustments; minor signal location adjustments as needed; installing plastic delineators; minor drainage adjustments;

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents