Similar Projects
Fore Street Sewer Separation - City of Portland
Infrastructure
Conception
$2,000,000 CJ est. value
Portland, ME 04101

Coyle's Culley / Ricker Park - City of Portland
Renovation, Infrastructure
Conception
$550,000 CJ est. value
Portland, ME 04101

Katahdin Drive Utility Improvements Project
New Construction, Infrastructure
Bidding
$2,900,000 CJ est. value
Brunswick, ME 04011

Windham Field Allen SRRF Underground Sprinkler and Domestic Water Service Upgrade
Post-Bid
Windham, ME 04062

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Water Main Replacement in Narragansett Street
Infrastructure
Results
Gorham, ME 04038

Water Line to North Windham Fire Station
Infrastructure
Results
Windham, ME

Costco At Scarborough Downs
New Construction, Infrastructure - 161,000 SF
Pending Verification
$41,000,000 CJ est. value
Scarborough, ME 04074

Chase Bank / Yarmouth
New Construction, Infrastructure - 3,294 SF
Pending Verification
$750,000 CJ est. value
Yarmouth, ME 04096

Water / Sewer Service Installation at 145 Allagash Drive
Infrastructure
Post-Bid
Brunswick, ME 04011

Water Line and Utility Vaults MM 47.1, MM 47.6, and MM 48.5
Infrastructure
Results
Less than $1,000,000 est. value
Portland, ME

Lyseth Playground Renovation - Site Work and General Construction Needs
Infrastructure
Post-Bid
$85,000 CJ est. value
Portland, ME 04103

Water Main Replacement in Willowdale Road
Infrastructure
Results
Scarborough, ME 04074

Water and Sewer Main Replacements in Concord Street
Infrastructure
Results
Portland, ME 04103

Phase 3 Water Main Replacement Project
Infrastructure
Results
$450,000 est. value
Bridgton, ME

Last Updated 09/06/2022 02:31 PM
Project Title

Inflow and Infiltration Phase 3 Mitigation - City of Portland

Physical Address View project details and contacts
City, State (County) Portland, ME 04101   (Cumberland County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. As of September 6, 2022, this project is included in the City of Portland's FY 2023 Budget CIP and funding is allotted for FY 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents