Similar Projects
RR-21-4821 Pavement Repairs
Infrastructure
Bidding

Central Division - Asphalt Paving Maintenance
Post-Bid

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water System Improvements - Contracts 1, 2, and 3
Results
Apple River, IL 61001

Bituminous Resurfacing
Infrastructure
Post-Bid
Galena, IL 61036

Elizabeth 2021 Water System Improvements Contract B Water Main Replacement
Results
Less than $1,100,000 est. value
Elizabeth, IL 61028

West Side Water System Improvements 2021
Demolition, Infrastructure
Post-Bid
Galena, IL

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

2021 Street Repaving Program
Infrastructure
Post-Bid
Galena, IL

2021 General Street Maintenance
Results
$77,269 est. value
Stockton, IL

Water Main Improvements
Infrastructure
Post-Bid

Parking Lot
Results
East Dubuque, IL 61025

Installation of Oversized Chevrons along Interchange Ramp Curves at Various Locations
Infrastructure
Post-Bid

Water Valve Replacement
Results
$7,000 est. value
Galena, IL

Last Updated 12/10/2021 11:35 AM
Project Title

Water System Improvements 2021 Contract B

Physical Address View project details and contacts
City, State (County) East Dubuque, IL   (Jo Daviess County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $832,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of the construction of a 200,000 gallon single pedestal water tower. The project also includes a main extension to the proposed water tower site. Included in the project is various site work associated with the proposed water tower site including earthwork, storm sewer, clearing and grubbing, HMA pavement, seeding, erosion control, etc. The project also includes the reconstruction of approximately four blocks of Desoto Street including 1100 tons of HMA pavement, 3750 tons of base stone, minor storm sewer improvements and sidewalk improvements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 09 - Finishes, Painting, Interior Painting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Common Work Results for Utilities, Manholes and Structures, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 40 - Process Integration.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents