Similar Projects
Del Webb Server Room
New Construction
Conception
Salem, OR 97301

Universal Plaza
New Construction
Design
Tigard, OR 97223

Wetland Complex
New Construction
Design
$45,000,000 est. value
Redmond, OR

Block 67 Redevelopment
Renovation
Bidding
Hillsboro, OR

USPS IQ JOC Oregon
New Construction, Renovation
Bidding
Less than $10,000,000 est. value

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

Capital Improvements Baker City Employment Office
Renovation
Results
$845,500 est. value
Baker City, OR 97814

Community Corrections Center Bathroom Repair Project
Renovation
Results
$250,000 est. value
Hillsboro, OR 97123

NAVFAC Northwest 8(a) Small Multiple Award Construction Contract (MACC) Regional Contract
New Construction, Renovation, Demolition, Alteration
Design
Less than $400,000,000 est. value

Construction Management / General Contracting - North County Campus
Renovation - 16,663 SF
Bidding
$3,800,000 est. value
Redmond, OR 97756

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

On Call Facilities Maintenance Services
New Construction
Post-Bid
Hillsboro, OR

On-Call General Construction Services
New Construction, Term Contract
Post-Bid
$8,500,000 est. value
Eugene, OR

Reported 01/08/2022 12:00 AM
Project Title

USFWS Baskett Slough NWR Vault Toilet Replacement

Physical Address View project details and contacts
City, State (County) Dallas, OR   (Polk County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

3.1 Demolition and disposal of existing single vault Romtec restroom. The existing restroom is approximately 8’x7’ and is situated on a 24’x14’ concrete slab. The refuge prefers complete demolition and disposal as part of this contract, however we request it be an add/alternate line item as we may elect to remove the above ground structure, concrete pad, and/or existing vault if necessary to meet our budget.

Details

Misc. Buildings, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents