Similar Projects
The Homes at Avon Park
Renovation
Conception
Hartford, CT

Lawton Road Residential Development
New Construction
Conception
Canton, CT

West Street Hotel
New Construction, Infrastructure - 22,620 SF
Design
$6,800,000 CJ est. value
Southington, CT 06479

Stony Brook Village Phase III
New Construction - 40,000 SF
Design
Suffield, CT 06078

Veterans Terrace Phase 2
Demolition
Post-Bid
$10,900,000 est. value
East Hartford, CT 06108

The Spark - 690 Cedar Street Apartments
New Construction, Infrastructure - 364,669 SF
Post-Bid
$55,000,000 CJ est. value
Newington, CT 06111

Chuck E. Cheese #470 / Newington
Renovation - 9,222 SF
Results
$1,438,632 est. value
Newington, CT 06111

Stair Tread Replacement Project at Cold Springs Apartments Pa 69-4
Renovation
Results
$62,750 CJ est. value
Manchester, CT 06042

HOH Boiler House
Renovation - 6,277 SF
Construction
$8,000,000 est. value
Hartford, CT 06100

Berkshire West
New Construction - 18,915 SF
Construction
$2,600,000 est. value
West Hartford, CT

New Britain Avenue Mixed Use
Demolition, New Construction, Infrastructure
Pending Verification
$34,208,000 CJ est. value
West Hartford, CT 06110

Main Street Apartments
New Construction
Pending Verification
East Berlin, CT

Showcase Cinema Redevelopment
New Construction
Conception
$10,000,000 est. value
East Hartford, CT 06118

Rockwell Landing
New Construction
Design
Hartford, CT 06105

Westbrook Village Phase IV
New Construction
Post-Bid
Hartford, CT 06105

Last Updated 07/12/2023 01:03 PM
Project Title

Hilton Hartford Renovations and Rebranding

Physical Address View project details and contacts
City, State (County) Hartford, CT 06103   (Hartford County)
Category(s) Commercial, Residential
Sub-Category(s) Apartments/Condominiums, Hotel/Motel
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,825,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the remodel of an existing hotel to hold 147 apartments, and 166 hotel rooms. As of July 12, 2023, construction has commenced. Additional information is not expected to become available. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Remodeling, Remodeling. Renovation, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents