Similar Projects
14th Street - Connector to Ferguson Park (Crestview District) - City of Temple
Infrastructure
Conception
$1,800,000 est. value
Temple, TX 76501

SH 317 Ground Storage Tanks and Pump Station - City of Temple
Infrastructure
Conception
$3,000,000 est. value
Temple, TX 76501

Lake Sharon 3MG Tank Rehab
Renovation, Infrastructure
Design
$1,955,000 est. value
Belton, TX

BancorpSouth - Adams Avenue Branch / Temple
Addition, Demolition, Infrastructure, Renovation - 6,264 SF
Design
$1,750,000 CJ est. value
Temple, TX 76502

RFQ Design - Professional Architectural and Engineering Design and Management Services for the Emergency Operation Complex and Fire Station No. 4
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Killeen, TX 76541

Beeline Drive Sewer Line Replacement
Infrastructure
Bidding
$600,000 CJ est. value
Harker Heights, TX 76548

Sampson-Howard Elementary School
New Construction, Infrastructure
Sub-Bidding
$38,200,000 CJ est. value
Temple, TX 76501

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Deployment Readiness Reaction Field (Drff) Repairs and Improvements Fort Hood, TX
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Fort Hood, TX

World-Wide Water Storage Tank Remediation
Term Contract
Results

Construction of E. Avenue H Improvements - Mesquite to Jackrabbit
Results
Nolanville, TX

Starbucks / Killeen
Infrastructure, Renovation - 2,390 SF
Construction
$750,000 CJ est. value
Killeen, TX 76549

Starbucks / Killeen
Infrastructure, Renovation - 2,390 SF
Construction
$750,000 CJ est. value
Killeen, TX 76549

Bird Creek Basin Wastewater Projects
New Construction
Pending Verification
$5,400,000 est. value
Temple, TX

Belton Early Childhood School - Belton Independent School District
Infrastructure
Pending Verification
$178,400 CJ est. value
Belton, TX 76513

Last Updated 10/13/2022 01:04 PM
Project Title

EST#2 New Ground Storage Tank and Pump Station

Physical Address View project details and contacts
City, State (County) Morgans Point Resort, TX 76513   (Bell County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of new 1,500-gpm pump station, 250,000-gal ground storage tank, disinfection system, associated site piping, generator, above ground fuel tank, and driveway. Perform exterior and interior rehabilitation of existing 200,000-gal elevated storage tank #2. Question Period Deadline: March 1, 2022 A bid bond in the amount of five percent (5%) of the bid issued by an acceptable suretyshall be submitted with each bid. Alternatively, a certified check or money order of the same amount payable to the Cityof Morgans Point Resort, Texas may be submitted in lieu of a Bid Bond. Bids and bid bonds/checks may be held by the City of Morgans Point Resort for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidders qualifications prior to the contract award. The City of Morgans Point Resort reserves the right to reject any or all bids or to waive any informality in the bidding.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents