Similar Projects
B.A. Kennedy Dishwasher
Post-Bid
Prairie du Chien, WI 53821

District Wide Bottle Filler Stations - Bid Package 2
Alteration
Post-Bid
Milwaukee, WI 53228

Sturgeon Bay Generator Replacement
Renovation
Results
Sturgeon Bay, WI 54235

Walk Thru Metal Detectors (WTMD)
Results

Seed Freezer and Installation
Term Contract
Post-Bid
Sturgeon Bay, WI 54235

Walk In Freezer Blackwell Job Corps, Material and Install
Term Contract
Results
WI

Tractor and Snow Blade for Appleton International Airport
Alteration
Post-Bid
Appleton, WI 54914

Human Services Electric Vehicle Charging Station
Alteration
Results
Madison, WI 53704

Gym Equipment (Commodity Only) for Remodeling at Merrill Park
Alteration
Post-Bid
Milwaukee, WI

Green Bay Facility Air Compressor Replacement
Alteration
Results
Green Bay, WI 54302

Dry Recirculating Scrubber (DRS) System
Alteration
Post-Bid
Almena, WI 54805

Sign Pipe
Alteration
Results
Madison, WI

IYF1800C Ice Machine Condensing Unit
Alteration
Post-Bid
Mauston, WI 53948

Jail Dishwasher Replacement Project
Term Contract
Results
West Bend, WI 53090

Gravity Belt Thickener Equipment
Alteration
Post-Bid
Milwaukee, WI

Last Updated 02/21/2023 03:22 PM
Project Title

Chimney Repairs Halbert Heating Plant - MEP

Physical Address View project details and contacts
City, State (County) Superior, WI 54880   (Douglas County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $240,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

** As of  February 7, 2023 this project has not yet been awarded. A timeline or award has not yet been established.**  This project is being let using the single prime bidding and contracting process. DFD will publicly bid the26 applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 527 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each28 applicable MEP division of work. These successful MEP bids must be included in all general prime29 contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will30 publicly open general prime contractor bids. General prime contractor bids that do not include the31 successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified,32 responsible, certified general prime contractor and this general prime contractor will enter into subcontracts33 with the successful MEP bidders . A-2 In general, the work consists of performing exterior masonry repairs consisting of tuckpointing approximately 5,000 linear feet of masonry joints and replacing approximately 100 units. In addition, install IR LED aviation obstruction light units and install liquid collector to the perimeter at the top of the chimney. o Seal cracks in existing concrete chimney cap o Perform exterior masonry repairs o Clean, repair, recoat and seal existing steel tension bands o Clean, repair, and recoat existing exterior ladder and exterior platform handrails, grating, and support framing o Seal cracks in existing concrete cap above the exterior breeching offset o Recoat exterior breeching, cleanout door and door frame o Place new heat-resistant insulation to fill existing gaps at breeching inlet o Check electrical continuity of air leads down through lightning protection to ground o Apply siloxane water proofing o Inspect chimney interior per specifications and perform interior tuckpointing and masonry repair o Install new IR LED aviation lights o Install new stainless steel liquid collector around the perimeter of the top of the chimney with (1) drain o Install heat tape inside of drains along with a monitoring system to prevent freezing . Base Bids will be received as a single lump sum bid for: 5) Electrical. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Bidding Documents will be available online immediately upon the project being advertised for bid.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents