Similar Projects
Pre-Construction And Cmar Services For Saluda River Force Main Extension Ss7568
Bidding
$4,000,000 to $8,000,000 est. value
Columbia, SC

Storm Drains / Catch Basins
Bidding
Mullins, SC

Effluent Pumps Rehabilitation Project
Post-Bid
SC

Well Pump Replacement
Post-Bid
Saint George, SC 29455

Irrigation Well/Pump Repair/Replacement
Results
Florence, SC

Mable T. Willis Boulevard Well
Results
Walterboro, SC 29488

Pump And Well For Florence Sports Complex
Bidding
Florence, SC

South Broad Street Storm Pipe Rehabilitation
Post-Bid
$150,000 to $200,000 est. value
Walhalla, SC

Cavendale Drive Stormwater Improvements
Results
Less than $3,400,000 est. value
Rock Hill, SC

North Pleasantburg Sewer Re-Alignment
Bidding
Greenville, SC

Provide and Install Two New Fiberglass Sewer Tanks and Grinding Pumps at Charleston County K-9 Facility
Post-Bid
North Charleston, SC 29405

Stormwater Channel Maintenance
Results
Hilton Head Island, SC 29928

New Well No. 4 and Raw Water Main for Water Plant No. 5
Post-Bid
Sumter, SC 29150

Rivers Point Row Storm Drain Rehabilitation Project
Results
Less than $43,220 est. value
Charleston, SC 29401

Schwartz Wastewater Treatment Plant Philly RAS Pumps
Post-Bid
Conway, SC 29528

Reported 01/29/2020 12:00 AM
Project Title

Midtown Sewer Improvements

Physical Address View project details and contacts
City, State (County) Shell Point, SC   (Beaufort County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Shell Point collection system currently has multiple pump stations that discharge into a regional station SP01 and two (2) existing pump stations discharge to SP01 via an aerial gravity marsh crossing. In order to reduce the loading of that aerial crossing and mitigate potential SSO’s, this project intends to redirect forcemain flows from existing SP45 & SP36 pump stations to the existing SP18 pump station. SP18 pump station outflow will be redirected from the current 6-inch force main to the existing PI01 16-inch force main.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents