Similar Projects
Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,319,000 CJ est. value
Harrold, SD 57536

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,319,000 CJ est. value
Harrold, SD 57536

Install Cured in Place Pipe Lining in Condenser Water Piping
Term Contract
Design
Pierre, SD 57501

T.F. Riggs High School Athletics Addition - Pierre School District
Addition, Demolition, Infrastructure
Design
$9,300,000 CJ est. value
Pierre, SD 57501

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

South Dakota Cultural Heritage Center Renovation and Addition - Final Pricing
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$17,000,000 CJ est. value
Pierre, SD 57501

Underground Infrastructure Inspection
Infrastructure
Post-Bid

2022 SDDOT Airport Pavement Maintenance
Term Contract, Infrastructure
Post-Bid
SD

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2022 Pipe, Valves, Fittings and Hydrants
Infrastructure
Results
Pierre, SD

Access Connection/Road Improvement - Cow Creek Recreation Area
Infrastructure
Construction
$275,952 CJ est. value
Pierre, SD 57501

Access Connection/Road Improvement - Cow Creek Recreation Area
Infrastructure
Construction
$275,952 CJ est. value
Pierre, SD 57501

North Bend Wind Project
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Pierre, SD 57501

OAHA YMCA Phase 2 Addition
Addition, Demolition, Build-out, Infrastructure
Pending Verification
$500,000 CJ est. value
Pierre, SD 57501

Last Updated 03/21/2023 07:46 AM
Project Title

Mill, AC Resurfacing, Pipe Work

Physical Address View project details and contacts
City, State (County) Harrold, SD 57536   (Hughes County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $4,711,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SD34 - Fm Hughes/Hyde Co Line to the SD47 N Jct Length 11.6 As of March 21, 2023 the project is in Conceptual status. Anticipated Construction year is 2024. SDDOT - Mill, AC Resurfacing, Pipe Work *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents