Similar Projects
Landfill Outbound Truck Scale
Infrastructure
Bidding
FL

Section 5 Cell 1A Liner Repair
Post-Bid
FL

South Dade Landfill Gas System
Post-Bid
$2,166,018 est. value
Homestead, FL 33032

Northwest Transfer Facility Improvements (Design Build)
New Construction
Results
Less than $11,500,000 est. value
FL

Stage II, Phase I GCCS Expansion Lena Road Landfill
Results
Bradenton, FL 34205

Construct an Expansion for the McKay Bay Solid Waste Transfer Station
New Construction - 5,600 SF
Construction
Tampa, FL 33600

West Pasco Resource Recovery Facility Class I Scale House Replacement
New Construction
Construction
FL

Trail Ridge Landfill Phase 6 - Landfill Gas System - Phase 2 PQ Horizontal
Post-Bid
Jacksonville, FL 32234

Landfill Infrastructure Installation, Maintenance, Repair, and Monitoring Services
Term Contract
Results
Nokomis, FL 34275

Collier County Landfill Scalehouse Construction
Post-Bid
$1,100,000 est. value
Naples, FL 34117

Trail Ridge Landfill Phase 6 - Landfill Gas System-Phase I
Results
Less than $1,056,100 est. value
Jacksonville, FL 32234

Landfill Disposal Site
Post-Bid
Bunnell, FL

Operation, Maintenance and Monitoring of the Landfill Gas, Leachate and Stormwater Management Systems at the Orange County Landfill
Term Contract
Results
Less than $5,420,165 est. value
Orlando, FL 32829

Perdido Landfill Wetland Delineation
Alteration
Post-Bid
Cantonment, FL 32533

Phase 3 Flare (Eu011) Upgrade at the North Central Landfill (NCLF)
Results
Less than $183,000 est. value
Inwood, FL 33880

Last Updated 07/13/2021 08:37 AM
Project Title

Perdido Landfill Gas Collection and Control System (GCCS) Expansion

Physical Address View project details and contacts
City, State (County) FL   (Escambia County)
Category(s) Environmental
Sub-Category(s) Landfill
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally includes but is not limited to the following items: 1. Construction staking/system layout/surveying prior to construction. 2. Installing below grade Polyvinyl Chloride and High-Density Polyethylene landfill gas extraction wells. 3. Installing below grade high-density polyethylene LFG laterals and header, air supply line, and dewatering discharge line. Header appurtenances also to be installed include, but are not limited to, sumps, isolation valves, access risers, and blind flanges. 4. Installing air supply line isolation valves, dewatering discharge isolation valves and air release valves. 5. Installing gas wellheads, including fittings, valves, tubing, hoses, clamps, regulators and filters, and related appurtenances. 6. Installing new pumps, including tubing, clamps, and related appurtenances. 7. Installing HDPE liner boots on all ground penetrations, including, wells, air/condensate riser pipes, isolation valves, access risers, bollards, sumps, and all other related GCCS appurtenances. 8. LFG well abandonments. 9. Abandonment in-place of limited sections of the existing GCCS. 10. Connection of the GCCS Expansion to the existing GCCS. 11. Installing additional wellheads, sub-up valves and fittings, and pumps per County direction and approval. Refer to Bid Item Nos. 22 through 25. 12. System start-up and testing 13. Conformance surveying 14. Providing as-built documentation (record drawings).

Details

Division 02 - Existing Conditions, Landfill Construction and Storage.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents