Similar Projects
Remove and Install Concrete at Various Areas of Lee Kay Public Shooting Range Phase II
Bidding
Salt Lake City, UT 84128

The Inn Between Cement Walkway
Post-Bid
Salt Lake City, UT 84105

Park Building Basement Structural Repairs
Post-Bid
Less than $500,000 est. value
Salt Lake City, UT 84112

Copper Hills Elementary School, Remove and Replace Concrete
Results
$20,000 to $30,000 est. value
Magna, UT 84044

Small Concrete Projects
Results
Less than $8,563 est. value
Bluffdale, UT 84065

Concrete Work
Term Contract
Post-Bid

Class 4000 and 5000 Concrete
Term Contract
Results
Less than $40,000 est. value
West Jordan, UT 84088

Installation, Upgrade, or Repair of Concrete Services- Stage 1
Term Contract
Post-Bid

Remove and Install Concrete at Various Areas of Lee Kay Public Shooting Range
Results
Salt Lake City, UT

Concrete Ready Mix - 2020
Post-Bid
Granite, Sandy, UT 84070

2020 Murray City Concrete Repair
Results
Less than $977,030 est. value
Murray, UT 84107

On-Call Task Order Concrete Cutting Services
Post-Bid
Less than $54,306 est. value
Salt Lake City, UT 84114

2020 Murray City Concrete Repair Contract
Term Contract
Results
Less than $977,030 est. value
Murray, UT 84107

Ready Mix Concrete
Term Contract
Post-Bid
Salt Lake City, UT 84190

CAB - Concrete Repair and EIFS Replacement
Results
Less than $180,000 est. value
Sandy, UT 84070

Last Updated 03/30/2020 12:02 PM
Project Title

Concrete Installation and Repair

Physical Address View project details and contacts
City, State (County) Sandy, UT 84070   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide Canyons School District (CSD) with concrete installation and repair. 1. 4000 PSI exterior concrete (4% - 6% air entrained; Straight Bag Mix) 2. 6” gravel or engineered fill (compacted) 3. 4” thick (concrete) 4. Engineered fill with be placed in 6” lifts and compacted to 95% 5. Sealer (100% acrylic) 6. Broom finish 7. Relief cuts to match existing areas at the location (every 100 square feet max; no more than 10’ in any direction to the next relief joint) 8. Expansion joints every 50’ (or where abutting existing concrete) 9. 1/2” asphalt impregnated board 10. Excavation, haul-off, and forming included 11. Concrete install includes doweling in to the abutting concrete 2’ on center with #4 bar x 16".

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents