Similar Projects
Renovations to Berrien County Jail Painting and Plumbing Upgrades
Renovation
Post-Bid
$220,000 CJ est. value
Saint Joseph, MI 49085

MDOC Lakeland Correctional Facility - HVAC Systems Upgrade
Renovation
Results
$8,891,214 CJ est. value
Coldwater, MI 49036

Kinross Correctional Facility - Video Management System Upgrade
Renovation
Results
$1,878,208 CJ est. value
Kinross Charter Township, MI 49788

Chippewa Correctional Facility (URF) - Steam and Steam Condensate Tunnel
Renovation
Bidding
$300,000 CJ est. value
Kinross Charter Township, MI 49788

Bay Mills Justice Center Expansion
Addition, Demolition, Infrastructure
Bidding
$7,000,000 CJ est. value
Brimley, MI 49715

Housing Unit A Medical Wing Upgrades
Renovation
Results
$763,000 CJ est. value
Ionia, MI 48846

Deerfield Correctional Facilities Building Demolitions Project - Ionia Michigan
Demolition, Infrastructure
Results
$6,325,000 CJ est. value
Ionia, MI 48846

RFQ Handlon CF - Wi-Fi Cabling Infrastructure
Renovation
Post-Bid
Ionia, MI 48846

Handlon / Ionia Correctional Facility Bar Screen And Grinder Upgrades
Renovation
Bidding
$399,000 CJ est. value
Ionia, MI 48846

Food Service Flooring and Shower Upgrades - Parnall Correctional Facility
Renovation
Post-Bid
$370,000 CJ est. value
Jackson, MI 49201

Charles E. Egeler Reception and Guidance Center Various Safety Improvements
Renovation
Results
$2,790,000 CJ est. value
Jackson, MI 49201

Kent County Correctional - Cell Door Replacement B3 D2 D3
Renovation, Alteration
Results
Grand Rapids, MI

Jail - County of Livingston
Renovation
Pending Verification
$1,000,000 CJ est. value
Howell, MI 48843

Jail - Otsego County
New Construction - 24,621 SF
Pending Verification
$7,800,000 CJ est. value
Gaylord, MI 49735

RFP Design - Women's Huron Valley Correctional Facility (WHVCF) Power Plant Building - Phase 1 Boiler Replacements
Renovation
Post-Bid
$215,000 CJ est. value
Ypsilanti, MI 48197

Last Updated 05/15/2023 09:05 AM
Project Title

Chippewa Correctional Facility - Egress Ramps and Related Infrastructure

Physical Address View project details and contacts
City, State (County) Sault Sainte Marie, MI 49784   (Chippewa County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,769,300 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

For Chippewa Correctional Facility - Egress Ramps and Related Infrastructure This project includes work at three (3) buildings within the Facility. All locations include construction of a new exterior concrete ramps with retaining walls, sidewalks, new catch basins and structures, storm pipe, foundation drains, steel railings, cutting of existing masonry for new hollow metal doors and frames, hardware, new exterior lights and interior exit signs. One location involves erection of a temporary control fence, removal of an existing control fence, and installation of a new permanent control fence. LEIN CHECK (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith at email address: SmithD76@michigan.gov. The email "Subject" must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting). 5% Bid Security ACCEPTING QUESTIONS UNTIL: March 1, 2023 at 5:00 pm local time Location 4269 W. M-80, Kincheloe, MI 49784

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents