Similar Projects
Grease Trap Installation
Renovation
Sub-Bidding
$150,000 CJ est. value
Chelmsford, MA 01824

On-Call Labour for Heating System/Boiler Repair, Plumbing Repair, Roofing/Building Envelope Repair, Refrigeration/HVAC Repair and Electrical Repair
Term Contract
Post-Bid
North Reading, MA

Boiler Replacement at Alcott Elementary School
Alteration
Post-Bid
$300,000 est. value
Concord, MA 01742

Patriot Circle 689-1 Unit Renovations - Filed Sub Bid
Alteration
Results
$197,345 est. value
Littleton, MA 01460

Weston High School Wing F Roof Replacement - Sub Bid
Alteration
Results
$1,175,000 est. value
Weston, MA 02493

Wastewater Treatment Facility Phase 2 Upgrades
Alteration
Post-Bid
$11,600,000 est. value
Hudson, MA

Cambridge Electrical Department - The Shop - Slab Replacement - Sub Bid
Alteration
Results
$1,000,000 est. value
Cambridge, MA 02141

Rehabilitation Bathrooms Phase 2 Saunders Circle 667-3 - Sub Bid
Alteration
Post-Bid
$311,981 est. value
Tewksbury, MA 01876

Recreation On-Call Plumbing
Alteration
Results
$50,000 est. value
Lexington, MA

General Plumbing Work at Town Facilities for Fiscal Year 2023
Term Contract
Post-Bid
$15,000 est. value
Tyngsborough, MA

Taunton Lab Upgrades
Alteration
Results
$65,000 est. value
Hudson, Taunton, MA 02780

Back Flow Testing
Alteration
Post-Bid
Medford, MA

Barbieri Cafe Expansion Plumbing
Alteration
Results
$60,000 est. value
Framingham, MA 01702

Shady Hiill Drive and Puritan Road Water Main Replacement
Infrastructure
Post-Bid
$1,750,000 CJ est. value
North Reading, MA 01864

School Plumbing Project - Plumbing - Sub
Alteration
Results
$285,000 est. value
Waltham, MA 02451

Last Updated 07/21/2023 12:16 PM
Project Title

Freshman Academy Mechanical Project - Sub

Physical Address View project details and contacts
City, State (County) Lowell, MA 01852   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status All Submissions Received, Selection Underway, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $135,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Freshman Academy Mechanical Project. Estimated Cost $135,000 Freshman Academy Mechanical Project, GC has DCAMM in plumbing Freshman Academy Mechanical Project Work Scope Steam Plant Cut/Cap/Isolate and remove steam line and all associated hangers/brackets that feeds Freshman Academy-Contractor to Run Boilers to ensure there are no steam leaks (Contractor responsible for removal of all trash and Debree from work)-Repair brick wall where lines once penetrated exterior brick walls. Freshman Academy Remove heat exchanger and all associated parts such as (valves-pneumatic controls and lines-Isolation valves-piping/insulation (Prep/cut back/rework domestic cold-water feed to be tied into new boilers being installed Location to be determined by owner). (Contractor responsible for removal and disposal of all associated trash and Debree). Remove AHU#1 and all associated controls-duct work and insulation to be cut back far enough to allow installation and retro fit of new unit-Remove controls and wiring as needed (to be determined by owner). (Contractor responsible for removal and disposal of all trash and associated Debree). Install New AHU#1 contractor supplied with free cooling capability/fresh air bypass-tie in to fresh air intake-tie in fresh air controls to existing control panel in pent house-tie in to existing duct work-repair install duct insulation as needed-Tie in all associated piping/valves/isolation valves/pipe insulation-Tie in to electrical panel-tie in to control panel located in penthouse-remove 3 existing pneumatic actuators and install 3 new contractor supplied DDC controls and valves-tie in new DDC controls to existing control panel ensure proper communication and operation between panel and controls (One actuator located in HV Fan room top floor).Contractor responsible for initial startup and run through of equipment and controls to ensure proper operation of unit and controls-start up report to be submitted to owner.(Contractor responsible for removal of all associated trash and Debree). Remove Condensate return tank (Salvage Condensate Return tank for reuse in 1922 Building) and all associated electrical wiring-conduit back to panel/controls-valves-piping-steam traps-hangers-brackets etc. (Contractor is responsible for removal and disposal of all trash and associated Debree). Contractor to remove old condensate return tank from basement in LHS 1922 Building and disconnect from electrical disconnect and existing piping as needed-Contractor to remove and replace 20 feet of 2 1/2 " black pipe-2 1/2 " black union that ties in to the rear of the condensate tank leaking towards unionContractor to install pad under condensate tank prior to installing salvaged tank to create barrier between tank and floor (Dirt)-Contractor to install Salvaged condensate return tank from the Freshman Academy-rework pipe tie ins as needed-replace electrical disconnect-replace electrical whip-Tie in main electrical feed from disconnect to Salvaged condensate tank-Perform initial start-up and submit report to owner. (Note no controls associated with the set up just main power feed

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents