Similar Projects
Future Fire Station
New Construction
Conception
$20,000,000 est. value
McKinney, TX 75071

Virginia & Hardin Fire Station
New Construction
Conception
$14,050,000 est. value
McKinney, TX 75071

Fire Department Administration Building Facility
New Construction - 76,000 SF
Design
$43,200,000 est. value
McKinney, TX

Fire Station 8 Reconstruction
Renovation
Design
$12,250,000 est. value
McKinney, TX 75070

Fire Station 4 Roof Replacement Project
Renovation - 7,200 SF
Sub-Bidding
$250,000 CJ est. value
Plano, TX 75023

Systems Furniture & Installation
Post-Bid
Washington, DC

Warehouse Racking Upgrades
Term Contract
Post-Bid
Plano, TX

Construction Manager-at-Risk for the Town of Prosper Public Safety Complex, Phase 2
New Construction - 28,000 SF
Results
Less than $14,300,000 est. value
Prosper, TX

Joint Use Police Substation Remodel Project
Renovation
Results
$1,159,615 est. value
Plano, TX 75025

Anna Fire Station #2
New Construction
Conception
Anna, TX

Fire Station No. 4
New Construction
Design
Prosper, TX 75078

Furniture Acquisition Proposals
Alteration
Post-Bid
Richardson, TX

Fire Station 6
New Construction - 20,974 SF
Results
$12,000,000 est. value
Allen, TX 75013

Frisco Fire Station #5 Dormitory Renovation - City of Frisco
Renovation - 910 SF
Conception
$375,000 est. value
Frisco, TX 75035

City of Plano Police Department 2022 Renovation
Renovation - 8,200 SF
Design
$450,000 est. value
Plano, TX 75074

Last Updated 08/11/2022 11:06 AM
Project Title

Law Enforcement Center BP: Early Release

Physical Address View project details and contacts
City, State (County) Celina, TX 75009   (Collin County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Fire/Police Station, Furnishings
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Lee Lewis Construction, Inc. as Construction Manager at Risk will be accepting proposals from Subcontractors and Suppliers for the Celina Police Headquarters - Early Release Package.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents