Similar Projects
Last Updated | 02/16/2022 08:32 AM |
Project Title | Improvements to the Hurricane City Municipal Airport |
Physical Address | View project details and contacts |
City, State (County) | Hurricane, UT 84737 (Washington County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Runways/Taxiways |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work involved will include the following: Schedule I - Runway Lighting Schedule II - Taxiway Lighting The approximate quantities of major bid items involved in the proposed work are: 1 Each Install LED L-801A Airport Beacon 1 LS Install 40` Tip-down Beacon Pole and Foundation, Complete 1 Each Remove Windcone, Complete 1 Each Install LED L:-807 Windcone, Complete 10,250 LF Install #8 AWG, L-824C, 5000V, Wire 19,250 LF Install #6 AWG, Bare Copper Counterpoise Incl. Ground Rods and Terminations 8,850 LF Install #8 AWG, XHHW, 600 V, Wire 1 LS Install Airport Lighting Equipment Building with Electrical Equipment, Complete 2 Each Install L-829 Constant Current Regulator 1 Each Install L-854 Radio Controller, Complete 2 Each Install S-1 Cutout with Lockable NEMA 1 Enclosure, Complete 1 LS Install Electrical Service, Complete 18,100 LF Install 1-2" Sch. 40 PVC Conduit (DEB) 500 LF Install 1-2" HDPE Conduit Directionally Bored 9 Each Install Electrical Junction Box, Complete 31 Each Install LED L-861 Runway Edge Light, Complete 16 Each Install LED L-861E Runway Threshold Light, Complete 4 Each Remove L-858 Guidance Sign, Style 4, Complete 10 Each Install LED L-858 Guidance Sign, 2 Module 13 Each Install LED L-858 Guidance Sign, 3 Module 2 Each Install LED L-849I REIL System, Style E, Complete 2 Each Install LED L-881 PAPI System, Style B, Complete 9,750 LF Install #8 AWG, L-824C, 5000V, Wire 121 Each Install LED L-861T Taxiway Edge Light in Soil, Complete Construction for this project is expected to take 30 working day(s). |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |