Similar Projects
West Henderson Parks And Recreation, Phases 2 - 5 - PR247 - City Of Henderson
New Construction, Infrastructure
Conception
$84,000,000 CJ est. value
Henderson, NV 89015

Burkholder Blvd - Warm Springs To Russell, Phase 2 - ST093 - City Of Henderson
Infrastructure
Conception
$6,600,000 CJ est. value
Henderson, NV 89015

Boulder Lodge Expansion
Addition, Demolition, Renovation, Infrastructure
Design
$9,600,000 CJ est. value
Henderson, NV 89015

Tropicana Grand Canyon Apartments
New Construction - 682 SF
Design
Las Vegas, NV 89147

AutoZone #2208 / Las Vegas
New Construction, Infrastructure - 26,170 SF
Bidding
$7,000,000 CJ est. value
Las Vegas, NV 89115

Charleston Blvd - Rancho Dr to MLK Blvd & Rancho Drive Sewer Rehabilitation
Infrastructure
Bidding
$31,478,093 CJ est. value
Las Vegas, NV 89101

Delta Academy - Exterior
Alteration
Post-Bid
$85,680 est. value
North Las Vegas, NV 89030

Centennial And Lamb Commercial Site Work
Alteration
Post-Bid
North Las Vegas, NV 89115

Pavement Maintenance and Site Improvements
Results
$225,000 est. value
Las Vegas, NV 89131

Charleston Heights Community Center and Park
New Construction - 6,060 SF
Results
$5,400,000 to $6,000,000 est. value
Las Vegas, NV 89108

Touro University Parking Expansion Phase II
New Construction
Construction
Henderson, NV 89014

Inspirada Marketplace
New Construction - 39,460 SF
Construction
$10,000,000 est. value
Henderson, NV 89009

Laughlin Marina Resort
New Construction - 37,890 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Laughlin, NV 89029

Matter Logistics at North 15
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
North Las Vegas, NV 89030

Cactus, Las Vegas Boulevard to Bermuda - Clark County
Infrastructure
Conception
Las Vegas, NV 89183

Last Updated 08/24/2022 02:03 AM
Project Title

Silverado Ranch Park New Community Center

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89183   (Clark County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $19,873,433 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Silverado Ranch Park New Community Center. A requirement of the contract includes a certification that Bidder is not currently engaged in, and agrees for the duration of the contract not to engage in, a boycott of Israel. The Work consists of the construction of a 39,925 square foot Community Center, including, but not limited to: a gymnasium, complete with a main basketball court and two sub courts, six ceiling hung, retractable basketball backboards and hoops, bleachers, main volleyball court and two sub courts complete with nets, standard and in-floor covered slots and four pickleball courts complete with nets, standards and in floor covered slots. The program space includes the following: dance/yoga studio, senior/teen room, instructional kitchen with high residential equipment, multi-purpose room that can be divided into three rooms, exercise/fitness room, multi-purpose classroom, arts and crafts room, office areas, storage, washrooms, circulation, and utility areas. The Center also includes a walking/running track mezzanine complete with ramp, two sets of stairs and a bridge. Site work includes the following: grading, landscaping, parking, on-site roadways, drop-off round-about, performance plaza, entry from Silverado Boulevard, tie-in to the existing parking area, utilities and off-site connections to utilities. New construction includes, but not limited to all administrative and temporary work as outlined in Division 01 General Requirements and for a new 39,925 SF single story Community Center with mezzanine running/walking track at the north end of Silverado Ranch Park and its associated site work and off-site work. The site work includes a new parking lot with AC pavement, on site roadways of AC pavement, connection to the existing park parking lots, new access from Silverado Ranch Boulevard, round-about drop-off of concrete pavement, off-site connection to utilities, landscaping, irrigation and a performance plaza with a concrete stage and artificial turf. The building consists of a concrete slab-on-grade floor system with polished concrete flooring and other floor finishes such as wood flooring, epoxy flooring, carpet tiles, etc. all as specified in Division 9. The building structure includes metal and wood framing, steel and wood joists and metal and wood deck. The gymnasium walls are CMU bearing walls and the Community Center walls consist of metal stud bearing walls. Exterior finishes consist of water drainage exterior insulation and finish system (EIFS); aluminum walls, storefront and doors; single ply flat roof system and sloped standing seam metal roof system; and exterior building signage. Interior finishes include but not limited to; ceramic wall tile, decorative wood, painted gypsum board, acoustical ceiling tile in a "T-bar" grid, acoustical ceiling panels, plastic laminate clad casework, solid surface countertops, painted hollow metal doors frames and windows, coiling overhead doors, vertical rise acoustical partitions, tubular skylights, interior signage and graphics, sliding aluminum doors, side stacking aluminum glass doors, corner guard, toilet accessories and fire extinguishers in cabinets. The building includes mechanical, electrical, plumbing and low voltage systems that include access controls, lighting controls, intrusion controls and audio-visual system. The building includes complete fire sprinkler and fire alarm systems. Equipment includes, but not limited to, bleachers, gymnasium equipment, appliances and projection screen. Work includes haul off of approximately 3,500cy of native soil from the site to the BLM community pit. General Contractor to obtain dust permit for the project as well as the BLM community pit where the material will be exported. There is no water source at the BLM community pit. Minerals moved would need to be graded with proper dust control measures. *As of August 8, 2022, five addenda have been issued. APN.177-28-101-020 PN - 201124, 202115, 20082 Question Cuttoff Date & Time 6/27/2022 01:00:00 PM (ET)

Details

39,925 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents