Similar Projects
Main Street Water Main Replacement - Phase 2 (2023)
Infrastructure
Bidding
$810,000 CJ est. value
Oley, PA 19547

Sellersville Borough 2023 Street Resurfacing Program
Infrastructure
Bidding
$200,000 CJ est. value
Sellersville, PA 18960

Remove/Replace Pool Filter- Mount Pisgah State Park
Infrastructure
Sub-Bidding
$640,000 CJ est. value
Troy, PA 16947

Plumbing Supplies
Term Contract
Sub-Bidding
Pittsburgh, PA 15219

Plumbing Service
Alteration
Post-Bid
Throop, PA

Erie High School - Elkay LZO8WSLK - Wall Mount Bottle Filling Station - Installation
Alteration
Post-Bid
Erie, PA 16508

Welded Steel Water Storage Tank Maintenance Contract
Term Contract
Results
Less than $35,000 est. value
Washington Crossing, PA 18977

Well Pump/Piping Install and Treatment System Upgrade - Plumbing
Results
$28,365 est. value
Woodward, PA 16882

Existing Sinkhole Repairs Project
Infrastructure
Bidding
$200,000 CJ est. value
Hershey, PA 17033

Columbia County SR 4009 Pipe Repair
Infrastructure
Sub-Bidding
$40,000 CJ est. value
Hayfield Township, PA 16433

Joc Job Order Contracts Plumbing
Alteration
Post-Bid
Harrisburg, PA

Municipal Building Renovations - Plumbing Construction
Alteration
Results
Pittsburgh, PA 15227

Beaver County Geotech Maintenance 2023
Infrastructure
Bidding
$1,000,000 CJ est. value
Monaca, PA 15061

23 WHM SGL 48 Plumbing
Renovation - 3,200 SF
Sub-Bidding
$200,000 CJ est. value
Harrisburg, PA 17102

TMP MMC - Bid Package G - Electrical, Plumbing/Fire Suppression and Mechanical Trades
Alteration
Post-Bid
Pittsburgh, PA 15231

Last Updated 03/23/2023 11:16 PM
Project Title

2023 Roadway Improvement Program

Physical Address View project details and contacts
City, State (County) New Hope, PA 18938   (Bucks County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $83,142 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contract will generally include the overlay of portions of six Borough roads (4,139 SY/413 TON). The Contract will also include the reconstruction of two storm sewer inlets, 412 SY of pavement repair, 2,182 LF of curbline/intersection/driveway milling, 351 SY of half-width mill and 75 TON leveling/scratch course. Attachment #1 of PennDOT Proposal and Contract MS-944 contained in the Proposal and Contract Section of the Contract Documents, provides the quantities for each roadway. The "Instructions to Bidders" section describes the bidding requirements under this Contract. The project is subject to the terms of the Public Works Employment Verification Act (Act 127 of 2012). Completed and signed "Public Works Employment Verification Form" is required as a precondition to the award of the Contract and is to be submitted as part of the submission of the bid. This project is subject to the terms and conditions of the Pennsylvania Prevailing Wage Act, as determined by the Secretary of Labor and Industry and, therefore, must be bid as such. All work and materials shall be in accordance with electronically Standards and Specifications. Proposals must be accompanied by electronic copy of a certified check or bid bond in the amount of 10% of the total bid amount for the work detailed in Attachment 1. Proposals must also be accompanied by a completed Bid Form, Bidder's Qualification Statement, executed Anti-Collusion Affidavit and Public Works Verification Form as set forth in the Contract Documents. Failure to submit these three items with the bid proposal may result in disqualification of the bid. Clarification Deadline: 3/7/2023 4:00 PM

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents