Similar Projects
Roof Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Alma, AR 72921

Commercial Roof Work
Renovation
Sub-Bidding
$600,000 CJ est. value
Pine Bluff, AR 71601

Rehabilitation of a Single Family Owner-Occupied Dwelling
Renovation
Post-Bid
Rogers, AR

Hope Airport Roof Replacement
Alteration
Post-Bid
Hope, AR

Re-Roofing of the Maintenance Building
Results
North Little Rock, AR

Commercial Roofing Project at 216 South Main Street
Alteration
Results
Pine Bluff, AR 71601

Roofing Bids: 4-5 Buildings
Renovation
Construction
$57,835 CJ est. value
Beebe, AR 72012

Roof Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Camden, AR 71701

Senior Center Improvements Center
Alteration
Post-Bid
$30,000 est. value
Brockwell, AR

Quitman Elementary Re-Roof
Alteration
Results
Less than $870,000 est. value
Quitman, AR 72131

Roofing Project at Daisy State Park
Renovation, Term Contract
Sub-Bidding
$200,000 CJ est. value
Kirby, AR 71950

Roof Repairs
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value
Fort Smith, AR

Bella Vista City Hall Roof Replacement
Alteration
Results
Bella Vista, AR

Paron Pavilion Renovation
Renovation
Post-Bid
Paron, AR 72015

Repair of the Roof of Fire Station
Alteration
Results
Osceola, AR

Last Updated 10/13/2022 11:05 AM
Project Title

Roof Replacement for Benton City Hall

Physical Address View project details and contacts
City, State (County) Benton, AR 72015   (Saline County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

re-roof the existing City Hall building located at 114 South East Street in Benton, Arkansas. Removal of existing EPDM roof and installation of new PVC membrane roof. The project, Benton City Hall, located in Benton, AR, includes the provision of a complete Firestone Building Products: Firestone PVC KEE Adhered Membrane Roofing System. 1.01 SUMMARY A. Furnish and install thermoplastic sheet roofing system, including: 1. Roofing manufacturer's requirements for the specified warranty 2. Preparation of roofing substrates 3. Wood nailers for roofing attachment 4. Vapor barrier (optional) 5. Insulation 6. Cover boards 7. Thermoplastic membrane roofing 8. Metal roof edging and copings 9. Flashings 10. Walkway pads 11. Other roofing-related items specified or indicated on the drawings or otherwise necessary to provide a complete weatherproof roofing system. B. Disposal of demolition debris and construction waste is the responsibility of Contractor. Perform disposal in manner complying with all applicable federal, state, and local regulations.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents