Similar Projects
ITS Traveler Information Systems
Infrastructure
Sub-Bidding
$5,758,263 CJ est. value
New Haven, IN 46774

FWCS 2023 Site and Traffic PPI
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Fort Wayne, IN 46802

Woodhurst Addition Pole Rehabilitation Phase III
Alteration
Post-Bid
Fort Wayne, IN

Various Types of LED Lights for the Year 2022
Term Contract
Post-Bid
Fort Wayne, IN

Northrop HS Auditorium Stage Lighting
Alteration
Results
Fort Wayne, IN 46825

Adams Elementary Security and Lighting Improvements
Alteration
Results
$1,300,000 to $1,500,000 est. value
Fort Wayne, IN

On-Call Electrical Repair/Services
Alteration
Post-Bid
Fort Wayne, IN

Fairfield Lighting Improvements Phase IV
Alteration
Results
Fort Wayne, IN 46895

Engineering Technology and Computer Science Building Corridors Finish Stairs and Lighting Renovation - 2022
Alteration
Post-Bid
Less than $2,000,000 est. value
Fort Wayne, IN

New Haven Public Works Solar Array
Alteration
Results
New Haven, IN 46774

Transformer Equipment
Alteration
Post-Bid
Fort Wayne, IN

2022 Electrical PPI
Alteration
Results
Fort Wayne, IN

Switchgear/Control House Requirements
Alteration
Post-Bid
Fort Wayne, IN

FLP to WWPS Power Resiliency Phase I
Alteration
Results
$300,000 est. value
Fort Wayne, IN

Levan Scott Academy Bid Phase 2: Architectural and MEP
Alteration
Post-Bid
$1,600,000 est. value
Fort Wayne, IN 46806

Last Updated 01/31/2023 02:37 AM
Project Title

FLP to WWPS Electrical Intertie FLP Site Construction

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46805   (Allen County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $819,345 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of conductors, conduit, and electrical equipment terminating at Utility 2 circuit breaker within Electrical Building at Three Rivers Filtration Plant. A. The Work is located at the Three Rivers Filtration Plant, 1100 Griswold Drive, Fort Wayne, IN 46805. B. The Work to be performed under this Contract includes, but is not limited to, constructing the Work described below and all related appurtenances. The Work includes, but is not limited to, the following: 1. Installation of conductors, conduit, and electrical equipment terminating at Utility 2 circuit breaker within 3410 Electrical Building at Three Rivers Filtration Plant. Funding Source for This Project is Water State Revolvong Fund the Contractor Shall Furnish All Labor Insurance Equipment Materials and Power for the Complete Performance of the Following Project Flp to Wwps Electrical Intertie Flp Site Contruction as Follows Installation of Conductors, Conduit, and Electrical Equipment Terminating at Utility 2 Circuit Breaker Within Electrical Building at Three Rivers Filtration Plan All in Accordance With the Bidding Documents as Prepared by Fort Wayne City Utilities. No Bid Will Be Accepted From, or Contract Awarded to Any Person, Firm, or Corporation That is in Arrears to the City of Fort Wayne, Indiana, Upon Any Debt or Contract, or, Who Has Failed to Execute, in Whole or in Part in a Satisfactory Manner, Any Contract With the City; or, Who is a Defaulter as to Surety or Otherwise, Upon Any Obligation to the City, or is Engaged in Litigation With the City. Ourt Terminates Your Parent-child Rights, Powers, Privileges, Immunities, Duties and Obligations Including Any Rights to Custody, Control, Visitation, or Support in Said Children; and if the Court Terminates Your Parent-child Relationship, It Will Be Permanently Terminated, and Thereafter You May Not Contest an Adoption or Other Placement of Said Children. You Are Entitled to Representation by an Attorney, Provided by the State if Applicable, Throughout These Proceedings to Terminate the Parent-child Relationship. You Must Respond by Appearing in Person or by an Attorney Within Thirty (30) Days After the Last Publication of This Notice, and in the Event You Fail to Do So, Adjudication on Said Petition and Termination of Your Parental Rights May Be Entered Against You, in Your Absence, Without Further Notice. The Successful Bidder Will Be Required to Furnish a Satisfactory Labor and Material Payment Bond and Performance Bond Each in the Amount No Less Than One Hundred (100%) Percent of the Contract Price. The Board Reserves the Right to Reject Any and All Bids for Failure to Comply With Applicable Laws and/or With the Instructions to Bidders. The Board Also Reserves the Right to Waive Any Defect in Any Bid. 7% MBE and 5% WBE

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents