Similar Projects
Airwasher Replacement
Post-Bid
El Paso, TX 79906

Hueco Tanks State Park and State Historic Site North and South Residence HVAC Replacement
Results
$55,000 to $85,000 est. value
El Paso, TX 79938

Coldwell Administration AC Conversion
Post-Bid
El Paso, TX 79903

HVAC Control Replacement at El Paso Psychiatric Center
Results
$399,700 est. value
El Paso, TX 79905

Westside Annex Welders Exhaust Hood Project
Post-Bid
El Paso, TX 79922

District Wide HVAC System Repair
Post-Bid
El Paso, TX 79925

Chiller System Backup Pump, Trans Vista Building, El Paso DHQ
Results
Less than $32,500 est. value
El Paso, TX 79928

Evaporative Commercial Single Inlet A/C Unit
Post-Bid
El Paso, TX 79925

Tippin Elementary Chiller Compressor Replacement
Post-Bid
El Paso, TX 79912

Assorted Equipment Replacement
Results
Less than $250,000 est. value
El Paso, TX 79905

HVAC Equipment-Statewide
Results
Less than $44,107 est. value

Exhaust Ventilation System
Results
$25,000 to $100,000 est. value
El Paso, TX 79916

Provide And Install New Freezer In Building 1109 On Fort Bliss
Results
$500,000 to $850,000 est. value
TX

HVAC and Mechanical Products
Term Contract
Post-Bid

Refrigeration and Air Conditioning Maintenance and Repair
Post-Bid
Socorro, TX

Reported 09/18/2020 12:00 AM
Project Title

Douglass Library Air Conditioner Conversion

Physical Address View project details and contacts
City, State (County) El Paso, TX 79905   (El Paso County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Contractor to remove and legally dispose of three (3) evaporative air coolers. Two (2) cooler penetrations may be reused. One (1) cooler penetration shall be sealed watertight. 2. Contractor to install two (2) new six (6) ton refrigeration units (LuxAire product or equal) with economizers to ensure outside air requirements. New units shall include equipment stands permanently secured to roof deck structural members, flashing, manufacturer’s vibration isolators, and weather deflectors. Installation shall separate dissimilar metals with protective coatings or pre-formed separators to prevent contact and corrosion. 3. New installation shall connect to existing ductwork. Existing ductwork shall be cleaned inside and out. Exterior ductwork shall be wrapped in new foil faced fiberglass insulation, R12 minimum, with new metallic foil duct tape to hold insulation in place. 4. New installation shall include connection to an existing Energy Management Controls (EMCS) system, programmable thermostats for manual override when necessary, adjustable air registers and a Testing and Balance report to ensure cooling efficiency and consistent air pressure. 5. Contractor shall provide new dedicated circuits connected to existing electrical and EMCS panels located approximately 100 l.f. from subject area. All electrical work to be performed by a certified licensed electrician. 6. Completed installation shall be watertight and remain free from rattles, deflections, wind whistles and noise due to thermal expansion and wind pressure.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents