Similar Projects
Bob Jones Park Improvements
Renovation
Conception
$28,000,000 est. value
Southlake, TX

New Southwest Community Park
New Construction
Conception
$30,000,000 est. value
Mansfield, TX

Phase 3 School Bond Renovation
Renovation, Demolition
Design
Arlington, TX 76010

Wilshire Park Renovation
Renovation
Design
$1,800,000 est. value
Euless, TX 76040

Crowley Grove Park Improvements
Renovation, Infrastructure
Bidding
$4,000,000 est. value
Crowley, TX 76036

Bransford Elementary School South Playground Accessible Improvements
Alteration
Post-Bid
$58,000 est. value
Colleyville, TX 76034

Two Neighborhood Parks with Splash Pads and Related Amenities
New Construction
Post-Bid
$2,500,000 est. value
Mansfield, TX 76063

Toughman Course
Results
Fort Worth, TX 76119

Colleyville Gateways
Results
$6,500,000 est. value
Colleyville, TX 76034

Bedford Boys Ranch Park Phase Next
Construction
Bedford, TX 76021

IDEA Rise Public School
New Construction - 27,000 SF
Construction
$5,000,000 est. value
Fort Worth, TX 76116

Echo Lake Community Park Improvements
Infrastructure
Conception
$5,000,000 est. value
Fort Worth, TX

Multi-Campus Playground Accessible Improvements
Alteration
Post-Bid
$276,000 est. value
Colleyville, Euless, Grapevine, TX 76051

Playground Replacements at Worth Hills, Casino Beach and Hillside Park
Results
Fort Worth, TX

Gateway Park Development
Infrastructure
Conception
$8,000,000 est. value
Fort Worth, TX

Reported 06/17/2022 09:53 AM
Project Title

Baylor Scott & White All Saints Garage 10 Renovation

Physical Address View project details and contacts
City, State (County) Fort Worth, TX 76110   (Tarrant County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected July 2022, Construction Completion Expected November 2022
Bids Due View project details and contacts
Estimated Value $425,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: concrete demolition to accommodate new parking equipment on level 1. Ground floor will be partially restriped and two accessible spaces will be relocated interior to garage. Private drive adjacent to the garage be partially widened. As of June 2022, information regarding general contractor selection has not been disclosed. Construction is expected to commence in the summer 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Park/Playground, 28,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents