Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Ventnor City Fire Department (VCFD) Station 1 Locker Rooms
New Construction, Infrastructure
Design
$264,514 CJ est. value
Ventnor City, NJ 08406

Boardwalk Reconstruction Project
Infrastructure
Bidding
$350,000 CJ est. value
Atlantic City, NJ 08401

Boardwalk Reconstruction Project
Infrastructure
Bidding
$350,000 CJ est. value
Atlantic City, NJ 08401

Street Maintenance Snow and Ice Removal Services, Salt/Sand Spreading
Post-Bid

School House Lane Roadway and Utility Improvements
Infrastructure
Post-Bid
Hammonton, NJ

Improvements to Chelsea Area and Albany Avenue
Results
Atlantic City, NJ 08401

Site Improvements to the Smithville Elementary School
Results
Galloway, NJ 08205

2021 Bond Renovation - Buena Regional School District
Renovation, Infrastructure
Pending Verification
$30,600,000 CJ est. value
Buena, NJ 08310

NJDOT Municipal Aid FY2021 Reconstruction of Richards Avenue
Infrastructure
Bidding
$142,000 CJ est. value
Mullica, NJ 08037

T0731 Roadside Maintenance Herbicides and Insecticides - Statewide
Term Contract
Post-Bid

Riverside Drive Resurfacing
Results
Dorothy, NJ 08317

FY 2020 and FY 2021 Community Development Block Grant (CDBG) Beach Bulkhead Access
Infrastructure
Bidding
$189,000 CJ est. value
Margate City, NJ 08402

Snowplowing Services
Infrastructure
Post-Bid
Mays Landing, NJ

Kingsley Drive Paving Project
Results
Ventnor City, NJ 08406

Last Updated 08/11/2022 11:35 AM
Project Title

Municipal Aid - FY 2022 - Reconstruction of West Jersey Avenue - Phase I

Physical Address View project details and contacts
City, State (County) Egg Harbor Township, NJ 08234   (Atlantic County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $407,800 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the furnishing of all labor, materials, and equipment necessary to complete the work as shown on the Drawings and as described in the Specifications. The work on CONTRACT NO. 109 consists of reconstructing West Jersey Avenue. The work shall be completed within sixty (60) calendar days of the Contractor's receipt of written Notice to Proceed. Bids are to be submitted electronically in accord with this notice, then the bidder shall submit a copy of the bid guarantee with electronic submittal and mail PRIOR to bid opening the original to the Municipal Clerks office Township of Egg Harbor, 3515 Bargaintown Road, Egg Harbor Township, NJ 08234. No bid will be received unless in writing on the forms furnished, and unless accompanied by bid security in the form of a bid bond or certified check made payable to the Owner in an amount equal to 10% of the amount of the total bid, provided that the said security need not be more than $20,000 nor less than $500.00 and be delivered at the place on or before the hour named above. The bid shall be accompanied by a Certificate of Surety on the form included in the Contract Documents, from a surety company licensed to do business in the State of New Jersey, which shall represent that the surety company will provide the Contractor with the required bonds in the sums required in the Contract Documents and in a form satisfactory to the Owner's Attorney and in compliance with the requirements of law. Each bidder shall submit with his bid an "Ownership Disclosure Statement" and "Non-Collusion Affidavit" as stated in Public Law, 1975, C.127 NJSA 34:11-56,25 et seq. as amended in chapter 64 of the Laws of 1974 and P.L. 1977 Ch.33, NJSA 52:25-24.2 on the forms included in the Contract Documents. Public Works Contractor Registration pursuant to NJSA 34:11-56.48 et. Seq. is required for all projects/contracts that include construction, reconstruction, demolition, alter at ion, and alteration of repair or maintenance work on a public building. All Contractors and Subcontractors are required to submit a copy of their Business Registration Certificate issued by the NJ Division of Taxation (PL 2004, c 57 effective 9-1-04). Compliance with the New Jersey Prevailing Wage Act (N.J.S.A. 34:11-56.25) is required. Bidders must use the prepared proposal forms that are contained in the Contract Documents. After receipt of bids, no bid shall be withdrawn except as expressly authorized herein. The Owner shall award the Contract or reject all bids within 60 days of bid opening, except that the bids of any bidders who consent thereto may, at the request of the Owner, be held for consideration for such longer period as may be agreed. The Owner will evaluate bids and any award will be made to the lowest, responsive, responsible bidder, in accordance with N.J.S.A. 40A:11-6.1. A copy of N.J.S.A. 40A:11-6.1 is included in Section entitled Local Public Contract of this specification. The Owner reserves the right to reject any or all bids and to waive minor informalities or irregularities in bids received. The qualification and reclassification of bidders will be subject to the statutory provisions contained in N.J.S.A. 40A:11-25 to 32 ("Local Public Contract Law"). A copy of N.J.S.A. 40A:11-25 to 32 is included in Section entitled "Local Public Contract Law" of this specification. Successful bidders, after notification of award, but prior to signing a construction contract, shall submit to the township and the Dept. of LWD, Construction EEO Monitoring Program an initial project workforce report (Form AA 201) electronically provided to the public agency by the Dept. LWD, Construction EEO Monitoring Program, through its portal for distribution to and completion by the contractor, in accordance with the N.J.A.C. 17:27-7. The contractor also agrees to submit a copy of the Monthly Project Workforce Report once a month thereafter for the duration of this contract to the Dept. of LWD, Construction EEO Monitoring Program and to the public agency compliance officer The successful bidder will also be required to submit bonds and proof of insurance on or before execution of their respective Contracts as explained in the Contract Documents. Bidders are required to comply with all relevant Federal and State Statues, Rules and Regulations including but not limited to the applicable provisions of Title VI of the Civil Rights Act of 1964 as amended (42 USC 2000d 2000D 4A), the discrimination and affirmative action provisions of NJSA 10:5-31 et seq. and NJAC 17:24 (Contract Compliance and Affirmative Action for Public Contracts), the rules and regulations promulgated pursuant thereto, the State requirement for bidders to supply statements of ownership (N.J.S.A. 52:25 24.2) and the State requirement for submission of the names and addresses of certain subcontractors (N.J.S.A. 40A:11 16). Challenges to bid specifications must be made, in writing, addressed to the Owner, at least, three (3) business days prior to the bid opening date. Challenges filed otherwise will not be considered. Pursuant to P.L. 2004, c.57 (N.J.S.A. 52:32-44) effective September 1, 2004, all business organizations that conduct business with a New Jersey government agency are required to be registered with the State of New Jersey. Bidders shall include in their request the person of contact, firm name, firm address, firm phone and fax numbers. Any payment for contract documents must be made by business check and shall be made out to Mott Watkins Associates. If the Contract is awarded, no refunds will be given. If for any reason the Contract is not awarded, refunds will be made to bidders pursuant to N.J.S.A. 40A:11 24(b) when the Contract Documents are returned in reasonable condition within 90 days of notice that the Contract has not been awarded. It is the purpose of this Notice to Bidders to summarize some of the more important provisions of the Contract Documents. Prospective bidders are cautioned not to rely solely on this summary, but to read the Contract Documents in their entirety. The Township reserves the right to reject bids based upon the criteria specified in the Information to Bidders.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents