Similar Projects
SLED Tracking Renovation/Repair
Post-Bid
Columbia, SC

DIRTT Media Walls for USC Russell House University Union
Post-Bid
SC

Water Intrusion
Results
Columbia, SC

Replace Countertops PPS MHC
Term Contract
Results
$80,000 est. value
Columbia, SC 29202

HQ Building Fire Sprinkler Installation and Interior Improvements
Renovation
Post-Bid
$4,000,000 to $4,500,000 est. value
Columbia, SC

Family Court Service Counter Replacement
Results
Columbia, SC 29201

Furnish, Deliver and Install Acoustic System
Post-Bid
Columbia, SC

4000 PSI Concrete
Results
Columbia, SC

Install Foam Insulation
Post-Bid
Columbia, SC 29210

D1 Bridge on Call Concrete/Flowable Fill
Term Contract
Results

9390--Fabricate & Install Bathroom Panels, Sinks & Counters
Post-Bid
Columbia, SC 29209

Repair, Clean and Stain Log Cabin at Cooks Mountain
Results
Eastover, SC 29044

Supreme Court - Replace Wall Covering at Second Floor Corridor
Post-Bid
$50,000 to $65,000 est. value
Columbia, SC 29201

USC Green Quad Residence Hall and Learning Center Interior Painting Maintenance
Results
$550,000 to $625,000 est. value
Columbia, SC 29208

Ceiling Grid and Tile Demolition and Replacement
Post-Bid
Columbia, SC 29210

Last Updated 03/13/2019 10:46 AM
Project Title

Park Street Deck Repairs

Physical Address View project details and contacts
City, State (County) Columbia, SC 29201   (Richland County)
Category(s) Single Trades
Sub-Category(s) Concrete, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Remove existing deck coating and recoat with heavy traffic waterproof coating system. Remove and install expansion joint at fourth level. Remove and replace hard and/or defunct sealant on the CMU wall. Provide prescribed spacing (according to original drawings) between bearing points and beams or CMU walls allowing space to prevent contact and unintended loading transfer. Chip away and/or remove any spalled sections of beam or wall and fill with SikaTop 123 PLUS mortar or other pre-approved substitute. Fill gaps with flexible sealant. LBE goal is 5%
Details
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 07 - Thermal and Moisture Protection, Traffic Coatings.
Division 09 - Finishes, Flooring.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents