Similar Projects
Fayette Road Mixed Use Development
New Construction, Infrastructure - 20,000 SF
Conception
$129,500,000 CJ est. value
South Burlington, VT 05403

Fayette Road Mixed Use Development
New Construction, Infrastructure - 20,000 SF
Conception
$129,500,000 CJ est. value
South Burlington, VT 05403

Wagner Wood Estates
New Construction
Design
Milton, VT

UVM Health Outpatient Surgery Center
New Construction, Infrastructure - 84,006 SF
Design
$27,358,000 CJ est. value
South Burlington, VT 05403

10th Cavalry Apartments
Renovation - 78,153 SF
Post-Bid
$19,000,000 CJ est. value
Colchester, VT 05446

Pomeroy Park Playground Installation (Ages 2-5)
Infrastructure
Post-Bid
$22,500 est. value
Burlington, VT 05401

Paving FY 2022-2023
Infrastructure
Results
Williston, VT

BTV Residential Sound Insulation Program Phase 1, Group 1
Renovation
Results
South Burlington, VT 05403

Main Street Mixed Use
New Construction - 29,778 SF
Construction
$2,692,240 est. value
Winooski, VT 05404

Blakely Road Residential
New Construction, Infrastructure
Construction
$4,000,000 CJ est. value
Colchester, VT 05446

Tarrant Event Center - University of Vermont
Addition, Renovation, Infrastructure - 114,012 SF
Pending Verification
$95,000,000 CJ est. value
Burlington, VT 05405

New Chittenden Regional Correctional Facility - State of Vermont Buildings and General Services Division
New Construction, Infrastructure
Pending Verification
$62,000,000 CJ est. value
South Burlington, VT 05403

Pinecrest Drive Multi-Residential
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
Essex Jct, VT 05452

Silt Bathhouse
New Construction, Infrastructure, Renovation - 15,000 SF
Design
$3,000,000 CJ est. value
Burlington, VT 05401

Re-surfacing and New Design for Basketball Court Area For Rossignol Community Park
Renovation
Post-Bid
$200,000 est. value
Williston, VT 05495

Last Updated 10/04/2023 12:19 PM
Project Title

Summer Field

Physical Address View project details and contacts
City, State (County) Williston, VT 05495   (Chittenden County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Park/Playground, Paving/Reconstruction, Single-Family Homes, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $52,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the phased new construction of 30 one and two story multi-family buildings, an approximately 3,000-square-foot community building and a swimming pool. Phase one consists on 60 units. Scope details have not been released. As of October 4, 2023, no building permits have been submitted to the Town of Williston or the State of Vermont Division of Fire Safety. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the first quarter of 2024.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2 Stories Above Grade, New Construction, New Construction. 2 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents