Similar Projects
Ally Life Science Building
New Construction - 320,000 SF
Design
$10,000,000 est. value
Chicago, IL 60614

Life Science Laboratory Office Development
New Construction - 1,035,750 SF
Design
$218,000,000 est. value
Chicago, IL 60642

Microbiology Lab Renovation at Building N for Highland Community College
Renovation
Bidding
Freeport, IL 61032

Willowbrook High School New Science Lab
Renovation
Bidding
Villa Park, IL 60181

FY2021 BPA Contract - APS Site Operations
Post-Bid
Lemont, IL 60439

HCC Nursing Lab at Building N
Renovation
Post-Bid
Freeport, IL 61032

Richwoods High School Science Lab Renovation Phase II
Renovation
Results
Peoria, IL 61614

Construct TMDE Lab -- USAG-RIA -- BLDG 332
New Construction, Renovation - 3,000 SF
Results
$1,000,000 to $5,000,000 est. value
Rock Island, IL

Argonne National Laboratory Long Beamline Building Laboratory
New Construction - 23,000 SF
Construction
Lemont, IL 60439

Syngenta Seeds Research And Development Center
New Construction - 100,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Malta, IL 60150

Illinois Molecular Facility
New Construction - 50,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Skokie, IL

IDIQ MATOC for Healthcare and Medical Research Laboratory Facility Design Build Construction, In Support of The Defense Health Agency (DHA) Sustainment, Restoration and Modernization Program
New Construction
Post-Bid

Engineering Sciences Building - IQUIST Lab 1st Floor Tower
Renovation
Results
Urbana, IL 61801

DOM GI - Li & Bissonnette Lab
Renovation
Post-Bid
Chicago, IL 60637

America's Best Eyeglasses and Contacts
Build-Out
Post-Bid
Crestwood, IL 60445

Reported 02/05/2022 12:00 AM
Project Title

Rapid Response Construction Services at Fermilab

Physical Address View project details and contacts
City, State (County) Batavia, IL 60510   (Kane County)
Category(s) Laboratory
Sub-Category(s) Laboratory
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: 8(a) Set-Aside (FAR 19.8) The Subcontractor shall furnish all properly qualified management, supervision, personnel, materials, supplies, tools, transportation, and equipment with appropriate accessories (except as provided by FRA) and shall plan, schedule, coordinate and assure effective performance of all services described herein. The Subcontractor shall perform operations, maintenance, installation, testing and certification, connection, disconnection, alteration, renovation, renewal, replacement, improvement or upgrade, demolition and/or removal, component fabrication, testing and/or troubleshooting, setting and alignment and installation of material or experimental equipment, system or component commissioning, loading, unloading, preparation for shipping or receiving materials, and other related services of the GENERAL CONSTRUCTION trade covered by the Davis-Bacon Act & Service Contract Act.

Details

Laboratory, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents