Similar Projects
Bridgeland Central - Master Development
New Construction - 506,000 SF
Conception
Cypress, TX 77433

Sylvan Rodriguez Community Center
New Construction - 11,500 SF
Conception
$9,491,000 est. value
Houston, TX 77062

Yogasix
Renovation - 2,035 SF
Design
$230,000 est. value
Houston, TX 77345

Edgewood Park Community Center
New Construction - 12,000 SF
Design
Houston, TX 77033

Construction of Water and Paving Facilities For Bridge Creek Terrace Drive Street Dedication 2
Infrastructure
Bidding
$2,000,000 CJ est. value
Cypress, TX 77433

Reinhart Auditorium Building Repairs
Renovation
Bidding
$200,000 est. value
Houston, TX 77004

Rehabilitation of Pipe Coatings on a Trestle Over Cypress Creek
Infrastructure
Sub-Bidding
$1,200,000 CJ est. value
Houston, TX 77069

US 290 - Advanced Traffic Management System
Infrastructure
Sub-Bidding
$3,429,911 CJ est. value
Cypress, TX 77429

Clearing and Grubbing for Black Oak Phase 2
Infrastructure
Post-Bid

Planet Fitness
Renovation - 1,801 SF
Post-Bid
Crosby, TX 77532

Formal-CSP Beltway 8 Site Preparation
Results
Houston, TX

Construction of the Bridgeland Convenyance Channel South of Creekland Village Section 1 and 2
Results
TX

East River Phase I
New Construction - 649,156 SF
Construction
Houston, TX 77020

SPJST Lodge 88 Swim Club
Renovation
Construction
Houston, TX 77008

(H69) 22053 / O'Reilly Auto Parts
New Construction, Infrastructure - 7,453 SF
Pending Verification
$1,000,000 CJ est. value
Houston, TX 77032

Last Updated 07/26/2022 11:11 AM
Project Title

Klein Collins High School - Gym and Dance Additions (Package 1)

Physical Address View project details and contacts
City, State (County) Spring, TX 77388   (Harris County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development, Theaters/Auditoriums
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $559,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

All bids or proposals shall be available after award of contract, or the 7th day after final selection of bids or proposals, whichever is later. After receipt of bids or proposals, Satterfield & Pontikes Construction, Inc. will conduct its evaluation of the subcontractor bids or proposals in relation to the project requirements and will select the bid(s) or proposal(s) that offers the best value to Klein ISD. Klein ISD, the Owner, reserves the right to waive any informality and/or to reject any, or all bids, or proposals. Contact Charles D. Reagan at creagan@satpon.com for additional information on this project. Please forward all questions to Charles with S&P, deadline for submitting questions is five (5) days prior to bid day

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Foodservice Equipment, Audio-Visual Equipment, Projection Screens, Projectors, Broadcast, Theater, and Stage Equipment, Recreational Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating.
Division 13 - Special Construction, Sound, Vibration, and Seismic Control.
Division 21 - Fire Suppression, Fire Suppression Systems Insulation.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Theatrical Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems.
Division 28 - Electronic Safety and Security, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Earth Moving, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents