Similar Projects
Powerhouse Waste Heat Duct Insulation Replacement at the Jones Island Water Reclamation Facility
Alteration
Bidding
Milwaukee, WI 53207

Courthouse Split A.C. System for Data Room
Alteration
Bidding
Portage, WI 53901

Emergency Furnace Replacements
Term Contract
Post-Bid
Wisconsin Dells, WI 53965

Emergency Furnace Replacements
Term Contract
Post-Bid
Wisconsin Dells, WI 53965

911 Center Data Room Backup Cooling
Results
Madison, WI 53703

Kitchen Hood Replacement - General
Results
Less than $674,000 est. value
Menomonie, WI 54751

Multiple Heat Pump Unit
Infrastructure
Bidding
Lac du Flambeau, WI 54538

Testing, Certification, Preventive Maintenance, and Repair Services for Fume Hoods, Clean Rooms, Biosafety Cabinets, etc.
Term Contract
Post-Bid
Milwaukee, WI

WITC - Rice Lake Campus Heat Pumps
Results
Rice Lake, WI 54868

Pioneer, Valley View, and High School Air Conditioning
Post-Bid
Green Bay, WI 54313

Unit Heater Replacement
Results
Milwaukee, WI 53216

Barber Colman Controls Upgrade
Post-Bid
Neillsville, WI 54456

2020 Replacement of DPW HVAC System
Results
Franklin, WI 53132

Wilson Park Senior Center Boiler and Exhaust Fan Replacement
Post-Bid
Milwaukee, WI 53221

Heim Building AC Replacement
Results
Madison, WI 53713

Last Updated 10/04/2021 04:22 PM
Project Title

Medford Office HVAC Replacement

Physical Address View project details and contacts
City, State (County) Medford, WI 54451   (Taylor County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this Project consists, in general, of replacing furnaces with new furnaces and air-cooled condensers; providing new MERV 13 filters and air ionization units at the supply plenums; Increasing fresh air quantities with 10" dia. duct and motorized damper; converting combustion air in to a fresh air duct with new fresh air louver; replacing gas water heater with electric water heater and capping the flue vent to the chimney; replacing existing exhaust fans; replacing existing electric wall heaters; insulating supply ductwork trunks in the lower level, where feasible space allows; removing old exhaust fan in server room and capping duct at ceiling; balance and commissioning furnace-condensing units. The scope of the project includes adding attic insulation and modifying the attic access hatch, along with rough and finish work as shown on the plans and described within the specifications.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents