Similar Projects
Mockingbird Lane Office Development
New Construction, Infrastructure - 150,000 SF
Design
$32,000,000 CJ est. value
Dallas, TX 75235

Maple Avenue Apartments
New Construction, Infrastructure
Design
$3,600,000 CJ est. value
Dallas, TX 75235

Carbon Pump Station Improvements
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Irving, TX 75038

Replacement of Fire Station 41
New Construction, Infrastructure - 8,248 SF
Post-Bid
$4,208,000 CJ est. value
Dallas, TX 75230

Alley Reconstruction Group 17-1203
Results
$2,420,230 est. value
Dallas, TX 75248

Paving Improvements for Galloway Place Neighborhood and Northridge Addition Repairs
Results
$1,250,000 est. value
Mesquite, TX

23 Springs Mixed-Use / Dallas
New Construction, Infrastructure - 669,591 SF
Construction
$169,000,000 est. value
Dallas, TX 75201

Irving Mall Site Work
Renovation - 767,000 SF
Construction
Irving, TX 75062

Haven at Waterview / Richardson
New Construction, Infrastructure - 300,212 SF
Pending Verification
$90,000,000 CJ est. value
Richardson, TX 75081

McKinney Avenue Mixed-Use
New Construction, Infrastructure - 697,000 SF
Pending Verification
$200,000,000 CJ est. value
Dallas, TX 75201

City Jail Expansion and Upgrades - City of Carrollton
Addition, Demolition, Renovation, Infrastructure
Design
$2,400,000 CJ est. value
Carrollton, TX 75006

McKinney Avenue/Cole Two-Way Conversion
Post-Bid
Dallas, TX 75295

White Rock Lake Trail - Bath House to Winfrey Point
Infrastructure
Results
$2,423,330 est. value
Dallas, TX

Elm Fork Water Treatment Plant Filter Complex - Phase I
New Construction, Infrastructure
Construction
$155,100,000 CJ est. value
Carrollton, TX 75006

W W Bushman Elementary School - 2020 Bond - Dallas Independent School District
Renovation, Infrastructure
Pending Verification
$30,986,820 CJ est. value
Dallas, TX 75216

Last Updated 01/24/2023 03:13 PM
Project Title

Cedar Hill State Park Camping Loop Repairs / Shady Ridge & Eagle Ford Loops

Physical Address View project details and contacts
City, State (County) Cedar Hill, TX 75104   (Dallas County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Maintenance, Misc. Recreational, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $13,300,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Description: SpawGlass Contractors is soliciting bids for the following: Cedar Hill State Park Camp Loop Repairs - REBID 1570 FM 1382 Cedar Hill, TX SpawGlass Contractors E-Mail: dfwestimating@spawglass.com Contact: Ted Sena, Preconstruction Manager DFWEstimating@SpawGlass.com SPAWGLASS CONTRACTORS IS THE CONSTRUCTION MANAGER FOR THE COMPLETE RENOVATION OF THE CEDAR HILL STATE PARK CAMP LOOP PROJECT. THE PROJECT INCLUDES THE EAGLE FORD AND SHADY RIDGE CAMP LOOPS WHICH INCLUDES THE RENOVATIONS OF 160 CAMP SITES AND 4 NEW RESTROOM/SHOWER BUILDINGS. THE SCOPE OF WORK FOR THE EAGLE FORD AND SHADY RIDGE CAMP LOOP REPAIRS INCLUDES, BUT IS NOT LIMITED TO, SHORELINE PROTECTION; CAMP SITE RECLAMATION, RECONFIGURATIONS, RENOVATIONS AND IMPROVEMENTS; EXCAVATION AND FILL; CONCRETE PARKING AREAS; REMOVAL AND REPLACEMENT OF FOUR RESTROOM BUILDINGS, LIFT STATIONS AND FORCE MAINS; REMOVE AND REPLACE WATER LINES IN BOTH CAMP LOOPS; REPLACEMENT OF SECONDARY ELECTRICAL SERVICE AND REPLACEMENT OF A WATER LINE ALONG THE NORTH SPINE ROAD FROM THE SOUTHERN ENTRANCE TO LOOP Project address: 1570 FM 1382, Cedar Hill, TX 75104 Anticipated project start date: March 20, 2023 Project duration: 480 Calendar Days Total Project Costs: $13,300,300 Bid Response Due Date: 2:00 pm on Tuesday, January 24, 2023 Please e-mail your bids to dfwestimating@spawglass.com no later than the time and date listed above. Late bids will not be considered. Scope of Work: SpawGlass is accepting proposals for the following subcontracting scopes: Cleaning, Demolition, Concrete, Masonry, Structural Steel, Rough Carpentry, Finish Carpentry, Insulation, Metal Panels, Metal Roofing, Joint Sealants, Doors, Frames, Hardware, Storefront, Drywall, Tile, Painting, Specialties, Pic Nic Canopy Covers, Plumbing, HVAC, Electrical, Fire Alarm, Earthwork, Erosion Control, Gabion Baskets, Retaining Walls, Site Concrete, Asphalt Paving, Striping & Signage, Site Specialties, Landscape and Irrigation Systems, Water Utilities, Sanitary Utilities, Storm Utilities and Electrical Utilities. Required Qualifications: All subcontractors must be able to perform a complete scope of work for your respective trade and must meet any minimum qualifications requirements that may be mentioned in the bid documents. Please carefully read all of the specifications for this project. Bidders must submit a detail scope of work as well as acknowledge all bid documents including any Addendum that have been issued. Bonding/Insurance Requirements: Bidders must comply with insurance requirements set forth in the bid documents. Bidders with a contract value over $100,000 must provide the name and contact information of their Bonding Company as well as provide an ADD Alternate for the cost of a Payment and Performance Bond if so required by SpawGlass. Location of Plans & Specs: Plans, Specifications and Addendum will be available for download via iSqFt, Project #6489534. Email dfwestimating@spawglass.com to receive a link to the documents. SpawGlass will not provide any hard copy sets.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents