Similar Projects
Dfcm Construction - DHS Orem Dcfs/Dhs Bldg Fire Panel Replacement
Term Contract
Bidding
$76,803 est. value
Orem, UT 84057

Electrical Preventative Maintenance (Epm), Phase II
Term Contract
Bidding
Hill AFB, UT

Communications Technician Labor Service. Repair and Other Services
Post-Bid
Salt Lake City, UT

LAC Arena Lighting Upgrade
Post-Bid
$93,000 est. value
Taylorsville, UT 84123

USU Security Lighting Upgrade
Results
Logan, UT 84322

Lone Peak High Auditorium Lighting Upgrade
Results
Highland, UT 84003

Districtwide Electrical Services (High and Low Voltage)
Alteration
Bidding
Sandy, UT

Provide and Install Electric Vehicle DC Fast Charger and 2 Level 2 Charging Stations
Post-Bid
Cedar City, UT 84721

Oak Hollow Elementary School Daylighting Upgrade
Results
Draper, UT 84020

5th and U Pump Station Improvements and Backup Power
Renovation, Alteration
Bidding
$1,035,675 est. value
Salt Lake City, UT 84103

West Temple Street Lighting
Post-Bid
Salt Lake City, UT 84115

Ridgecrest Elementary School DayLighting Project
Results
American Fork, UT 84121

PCC Improvements Concrete, Fence, Lights, Electrical
Alteration
Bidding
South Jordan, UT

Electric Transmission/Distribution Hardware Material
Term Contract
Post-Bid
Provo, UT 84606

Lighting Control Upgrade for Kingsbury Hall
Results
Less than $80,000 est. value
Salt Lake City, UT 84112

Reported 08/14/2021 12:00 AM
Project Title

Electrical Work for Golden Age Center

Physical Address View project details and contacts
City, State (County) Vernal, UT 84078   (Uintah County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. From the existing Main Distribution Panel install a new 225 A, 3 Phase Breaker. 2. Approximately 70 feet away, in an existing wall in the kitchen, install a new 208Y/120 3 Phase, 250 A max, Panel Board with 42 spaces and a 225 A Main Breaker. 3. Install conduit from Main Distribution Panel to new Panel Board. 4. Pull new wire to power up new Panel Board. 5. Relocate from existing kitchen Panel Board, to new kitchen Panel Board, all circuits that are not protected by the Ansul System. (The existing Panel Boards 225 Amp main is a shunt breaker tied to the Ansul System.) 6. The new Panel Board will only house existing circuits. 7. In the existing Panel Board install 2 new, 3 Phase, 50 Amp Breaker to power a new set of double ovens. 8. Run conduit from existing Panel Board to 2 new 3 Phase 60 Amp Stainless Steel Fusible Service Disconnects. 9. Pull new wire to provide power to new Service Disconnects. 10. Connect the 2 new Stackable Ovens (already on site) to the new Service Disconnects under the existing hood, approximately 10 feet away from existing Panel Board. 11. Remove from the existing Panel Board the 3 Phase 30 Amp breakers and wires going to the existing Deep Fryer. 12. Install a new 3 Phase 50 Amp breaker for a new Deep Fryer. 13.Install a new 60 Amp 3 Phase Stainless Steel Fusible Service Disconnect. 14. Pull new wire to provide power to new Service Disconnect. 15. Bid should include all material and labor needed to complete job, including anything needed to work with existing Ansul system for fire protection.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents