Similar Projects
Eastside Wildlife Areas Aerial Granular Herbicide Application Project
Renovation
Design
$270,000 CJ est. value
Salem, OR 97301

Boeckman Creek Regional Trail - Phase 2 (Frog Pond) - CIP #9149 - City of Wilsonville
Infrastructure
Design
$620,000 CJ est. value
Wilsonville, OR 97070

Axle Scales and Installation
Renovation
Sub-Bidding
$100,000 CJ est. value
Eugene, OR 97403

Innovation Hall Selective Demolition
Demolition, Infrastructure - 44,200 SF
Sub-Bidding
$70,000 CJ est. value
Eugene, OR 97401

Water Quality Testing and Analysis Services
Infrastructure
Post-Bid
Tigard, OR

Walker MS Asbestos Abatement
Alteration
Post-Bid
$140,000 est. value
Salem, OR 97304

Lincoln High School Abatement
Renovation, Demolition
Results
Portland, OR

Huestis Hall Renovation Asbestos Abatement
Term Contract
Results
$200,000 est. value
Eugene, OR 97403

RFQ - Engineering and Design and/or Construction Management Services for Large-Scale Habitat Restoration Projects
Term Contract
Pending Verification
Portland, OR 97204

Oak Grove Stewardship IRSC
Infrastructure
Design
$500,000 CJ est. value
Sandy, OR 97055

Price Agreement Furnishing Traffic Striping & Signing
Infrastructure
Sub-Bidding
$600,000 CJ est. value
Portland, OR 97204

OR NPS CRLA 2018(1) Cleetwood Trail and Marina Improvements
Term Contract
Post-Bid
Crater Lake, OR 97604

2022 King Asbestos Abatement
Alteration
Results
$80,000 est. value
Portland, OR 97211

Notice of Intent to Award a BPA Call Order Against MASBPAs for Malheur Nation Forest Fuels Reduction - Laycock Creek
Term Contract
Design
$25,000 CJ est. value
Mount Vernon, OR 97865

Vegetation Management and Stewardship Services Phase I
Term Contract
Post-Bid
Hillsboro, OR 97124

Last Updated 08/25/2023 12:33 AM
Project Title

Blue Mile G-Z IRSC

Physical Address View project details and contacts
City, State (County) Chiloquin, OR 97624   (Klamath County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $9,814,569 [brand] Estimate
Plans Available from Agency's Affiliate - 05/08/23
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Aug 21, 2023 Contract Award Number: 12363N23C4020 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Y2BNXRK9LBQ7 Contractor Awarded Name: TWC CORP Contractor Awarded Address: Wilsonville, OR 97070 USA Base and All Options Value (Total Contract Value): $9,814,569.00. Update Question and Answer - No amendment will be posted for this update. Question - Item 31b Road reconstruction Construction Survey & Staking states a lump sum quantity of 20. What is unit of measure Stations, miles Answer - Construction Survey and Staking only applies and will only be required for 31(l) Roadway Excavation - Curve Widening. Both Item 31(b) and Item 31(l) are lump sum with gross quantity of 20. Both Items will be awarded together as needed. Background: The Go Big G-Z Stewardship IRSC shall be awarded under the following authority: Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014--Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. NAICS: 115310: Support Services for Forestry, size standard: 34M Fuels Management Services. Stewardship authorities permit the Government to solicit this requirement as Full and Open competition. Project Location: The project is located near the towns of Chiloquin, OR and Sprague River, OR between HWY 46 and 858 and surrounds Calimus Butte and East of Fuego Mountain. Legal description is: In all or portions of T33S R10E Sec 13-16, 21-29, 31-36. T33S R11E Sec 7-11, 13-24, 27-31. T34S R9E Sec 1, 2, 10-12, 13-17, 20-29, 32-36, T34S R10E Sec 1-36. T34S R9E Sec 6, 18, 19, 29-31, T35S R9E Sec 1-6, 9-12. T35S R10E Sec 1-12, 17, 16. R35S R11E Sec 6, 7. Willamette Meridian; Klamath County, Oregon Period of Performance: All work shall be completed by December 31, 2030. Description of Work: The intent of the project is to dramatically increase the pace and scale of forest restoration treatment to mitigate risk of catastrophic wildfire. The objective of this project is: For the contractor to complete the end-results from NEPA handoff through final completion of the project area. Contractor shall identify what work activities are needed across all project acres to meet the desired end-result objectives that shall be presented in maps and a detailed Implementation Plan prior to commencing layout. After the initial Implementation Plan (Design Detailed Logging Plan, Road Analysis Plan, Service Treatment Plan, and Contract Area Maps) has been accepted and approved, contractors will then: layout Timber Removal and Service Only treatment units. designate retention areas and clump marking or other clump retention designation. complete timber cruises for each identified timber removal treatment area. Perform road maintenance and/or road reconstruction required for forest product removal complete all on the ground timber removal and service work activities. Total timber quantities and treatment acres are unknown and shown as estimated gross quantity. Completion and acceptance of Item 1 will determine true needed quantities for all other Items. The use of "Stepladder Pricing" enables the Government to establish Firm-Fixed Pricing at time of award for all Items based on differing complexity. Changes have been made to the pre-solicitation drafts and include, but are not limited to: Clauses specific to Construction requirements have been added in their entirety to the solicitation. Timing of FS inspections and deliverables back to contractor have been added to Appendix A. Standard B-provisions of Appendix B have been revised and updated recently for all IRSCs, these updates have been incorporated into this contract. C-Provisions for Contract Time Adjustments (only applicable to IRTCs) were incorrectly added in the pre-solicitation drafts and have been removed. Awarded contract will be a commercial services contract with requirements for timber removal. The contract shall be awarded using a best value source selection method; the resulting contract shall be a firm fixed price commercial services contract.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents