Similar Projects
System Enhancement (Safety Improvements)
Infrastructure
Bidding

Forest Road Connection Project
Infrastructure
Bidding
Sedona, AZ 86351

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Road Construction IDIQ - Coconino & Kaibab National Forests
Post-Bid
$1,000,000 to $10,000,000 est. value
Flagstaff, AZ 86001

AZ NPS PP GRCA 2019(2), Pavement Preservation Grand Canyon
Results
$10,000,000 to $15,000,000 est. value
AZ

Asphalt 2020
Results
Flagstaff, AZ 86011

Antelope Canyon Resort & RV Park
Construction
$2,700,000 est. value
Page, AZ

Route N21(2) - Kaibeto Chapter - Road Maintenance
Infrastructure
Post-Bid
Kaibito, AZ

Left Turn Lane
Results
Less than $855,000 est. value
Page, AZ 86036

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Post-Bid
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

DEMA Camp Navajo Pavement Maintenance Single
Term Contract
Results
Less than $1,000,000 est. value
Bellemont, AZ 86015

Construct Fsr 4 Road Project - Tonto National Forest
Infrastructure
Post-Bid
$100,000 to $250,000 est. value
Rio Verde, AZ 85263

Street Maintenance Program 2021 , 2022, 2023 CMAR
Term Contract
Results
Flagstaff, AZ

Horsethief Basin Roads Maintenance - Prescott National Forest
Term Contract
Post-Bid
Prescott, AZ 86301

System Preservation (Restoration/Rehab/Resurface)
Results
Less than $1,900,000 est. value
Cameron, AZ

Last Updated 10/04/2021 09:23 AM
Project Title

CMAR - Design and Construction Services for Beulah/University Roadway Project

Physical Address View project details and contacts
City, State (County) Flagstaff, AZ   (Coconino County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,700,000 to $11,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New roadway construction, including a roundabout – with significant grading work, pedestrian underpass, replacing existing water and sewer mains, water and sewer services, stormwater improvements, and edge improvements (curb & gutter, sidewalk, etc.) for the entire Project limits.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents