Repair/Recondition One 50,000 GPM Vertical Centrifugal Water Pump (P-203)
Post-Bid
Baytown, TX 77520

Water Well No. 2
Post-Bid
TX

Water Well No. 4 at Water Plant No. 1
Results
Less than $1,450,000 est. value
TX

UCT-CHW & Booster Replacement
Results
Less than $143,731 est. value
Houston, TX 77030

Water Well No. 1 Replacement at Water Plant No. 1
Post-Bid
Less than $3,500,000 est. value
Houston, TX

Ground Water Well Rehabilitation Various Sites
Results
$2,639,083 est. value
Houston, TX 77000

Water Well and Plant Facilities - Site No. 1 Expansion
Post-Bid
Houston, TX

Water Well No. 6 Rehabilitation
Results
$120,800 est. value
Houston, TX 77084

MSB Chilled Water Pump Replacement
Post-Bid
Houston, TX 77030

Water Well No. 3
Results
Houston, TX 77002

Pump, Submersible, 2", Discharge, Trash
Post-Bid
Houston, TX 77251

CNP Utility District Water Well No. 2 Rehabilitation
Results
Houston, TX 77000

MHF80 Single Stage Vacuum Pump
Post-Bid
Houston, TX 77251

Well No. 2 Profiling
Results
Less than $270,000 est. value
Houston, TX 77064

Lift Station Wet Well and Discharge Pipe Coating
Post-Bid
TX

Reported 11/10/2020 12:00 AM
Project Title

Air Stripping Tower at Water Well No. 2

Physical Address View project details and contacts
City, State (County) Houston, TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation at Water Well No. 2 at Water Plant No. 1. This package includes: VOC Stripping Tower, Forced Draft Blower & Motor Assembly, 2- Effluent Transfer Pumps, Instrumentation, Control Valves, and a Control Panel. The equipment has been fabricated and is ready for shipment to the site upon award of the bid. A 14'x24'x1' concrete pad will be needed for the Stripping Tower and Pumps. All equipment will need to be piped into the existing facility and some exisitng piping will need to be removed. Site grading to include additional fill at the Northwest corner of the plant site at the drainage grate inlet. Fill Dirt needs to be replaced behind the fence of the last single-family residential lot so runoff no longer goes underneath the fence and into the home-owner’s yard during a heavy rain event. Re-shape drainage swale that directs water to the grate inlet at the plant property line.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents